Laserfiche WebLink
5 <br /> EXHIBIT B-3 (pg 1 of 2) <br /> CHS ENGINEERS,LLC <br /> BILLING RATES FOR 2005 and 2006 <br /> City of Everett Sewer System Replacement "H" (UP 3206) <br /> 2005 2006 <br /> Scott Christensen, P.E. Principal $ 121.00 $ 130.00 <br /> Rodney Langer,P.E. Principal $ 111.00 $ 117.00 <br /> Larry McAndrews, P.E. Principal $ 121.00 <br /> Evan Henke, P.E. Principal $ 102.00 <br /> John Nottingham,P.E. Principal $ 96.00 <br /> David Voigt, P.E. Project Manager $ 117.00 $ 120.00 <br /> Tom Partanen, P.E. Project Manager $ 102.00 <br /> Mary Dahl, P.E. Project Manager $ 96.00 <br /> Susan Gardner, P.E. Project Manager $ 87.00 $ 91.50 <br /> Diane Pottinger, P.E. Project Engineer $ 84.90 <br /> Jena Gilman, P.E. Project Engineer $ 101.25 <br /> Eli Zehner, P.E. Design Engineer $ 82.50 $ 88.50 <br /> Darrel Frame, P.E. Design Engineer $ 82.50 <br /> Matthew Bateman Design Engineer $ 74.25 <br /> Christopher Shaff Design Engineer $ 73.50 <br /> David Jensen Sr. Designer/Inspector $ 81.90 $ 84.00 <br /> Vicki Galdo CAD Technician $ 66.75 $ 71.25 <br /> Josh Korakis CAD Technician $ 54.00 $ 63.00 <br /> Nathan Hickok CAD Technician $ 66.00 <br /> Hank Bradley, P.L.S. Survey Manager $ 100.50 $ 111.00 <br /> John Leonard Crew Chief $ 67.50 $ 72.00 <br /> Boyka Georgieva Survey $ 51.00 $ 60.00 <br /> Nic Schmidt Survey $ 54.00 <br /> Two-Man Crew Survey $ 130.00 $ 135.00 <br /> Three-Man Crew Survey $ 165.00 $ 170.00 <br /> Caryl Turner Clerical $ 64.80 $ 67.50 <br /> Eva Gramer Administration S 66.00 <br /> 30 <br />