Laserfiche WebLink
3 <br /> project manager will insure that the latest WSDOT General and Special Provisions <br /> will be incorporated into the project specifications. (10 points) <br /> 7. Describe the consulting firm's and the project manager's most recent experience <br /> with estimating and forecasting construction costs on similar urban arterial projects. <br /> Please include a comparison of the project engineer's cost estimate and the actual <br /> bid award and construction cost, including an explanation of differences. Please <br /> include both agency and contractor contact names and phone numbers. (10 points) <br /> 8. Describe the consulting firm's and the project manager's recent experience in <br /> completing a major federally funded urban arterial project within a short and <br /> challenging timeline. Provide agency and contactor names and phone numbers. (10 <br /> points) <br /> 9. Explain how the project manager will maintain communication between the City <br /> contact(s) and other project team members, including subconsultants. Describe <br /> what techniques or tools the project manager will use to insure that all project team <br /> members are completing their tasks as assigned and on schedule, and how the <br /> project manager will report this information to the City's project manager. Describe <br /> the project manager's experience with using MS Project or other project <br /> management software. (10 points) <br /> 10. Provide recent letters of recommendation from previous clients for similar projects. <br /> (5 points) <br /> 11. Identify the geographic location of the design team's project office. Preference will <br /> be given to project offices closest to the City's Public Works Building in Everett <br /> (3200 Cedar Street in Everett). (5 points) <br /> The statements of qualifications shall be limited to twelve (12), single-sided, 8 %"x 11" <br /> pages. Four(4) additional sheets will be allowed for letters of recommendation from <br /> previous clients. No additional information or pamphlets will be considered by the <br /> selection committee. <br /> The City of Everett encourages disadvantaged,minority, and women-owned consultant <br /> firms to respond. <br /> The City of Everett does not discriminate on the basis of disability in the admission or <br /> access to, or treatment in, its programs or activities. Requests for assistance or <br /> accommodations can be arranged by contacting Gordon Larson at 425.257-8800. <br /> Please submit six (6) copies of the Statement of Qualifications to: <br /> Ryan L. Sass, P.E., City Engineer, City of Everett, 3200 Cedar Street, Everett, WA 98201 <br /> by Friday, April 21, 2006, not later than 4:00 PM. No submittals will be accepted after <br /> that date and time. Any questions regarding this project, solicitation, and submittals <br /> should be directed to Ryan L. Sass,P.E. at 425-257-8800, FAX 425-257-8856, or by e- <br /> mail at: rsass@ci.everett.wa.us . <br /> 8 <br /> 4 of 4 <br />