My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 5067
>
Resolutions
>
Resolution 5067
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2017 9:35:50 AM
Creation date
2/23/2017 9:35:23 AM
Metadata
Fields
Template:
Resolutions
Resolution Number
5067
Date
6/27/2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Agency Everett SIX YEAR TRANSPORTATION IMPROVEMENT PLAN Page 9 From 2002 to 2007 <br /> County No. 31 Hearing Date <br /> City No. 420 Adoption Date <br /> MPO PSRC Resolution No. <br /> Project Identification Project Costs in Thousands of Dollars Federally Funded <br /> A. Federal Aid No. Fund Source Information _ Expenditure Schedule Projects Only <br /> B. Bridge No. Federal Funding Local Agency <br /> C. Project Title R/W <br /> Func- D. Street/County Road Name or Number Improve- Phase Federal Federal State (2002) (2003) (2004) 4th Required <br /> tional Priority E. Beginning MP or road-Ending MP or road ment Total Utility Project Start Fund Cost by Fund State Local Total 1st 2nd 3rd thru Envir. Date <br /> Class Number F. Describe Work to be Done Type Status Length Codes Phase (mm/dd/yy) Code Phase Code Funds Funds Funds 6th Type (MM/YY) <br /> I 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 IC 19 20 21 <br /> 19 24 3 phases in project 32 P 00 P PE 5/1/02 10 10 10 <br /> O RW Yes <br /> Everett Non-Motorized Transportation Projects CN 9/1/03 600 600 50 250 300 <br /> Various locations within City Limits <br /> Various Locations to Various Locations _ <br /> Design-construct ped 8 Bike Paths 6 Bike lanes Totals _ 610 610 60 250 300 <br /> 19 25 2 phases in project 06 P 00 P PE 3/1/02 20 20 5 5 5 5 <br /> O CN 7/1/02 150 150 25 25 25 75 No <br /> City Entryway Landscaping and Signs <br /> Various Entryway Corridors within City limits <br /> Various Entryway to Various Entryway <br /> Design and Install Gateway landscaping end signs Totals , 170 170 30 30 30 80 <br /> 19 26 2 phases in project 05 P 0.4 C PE 1/1/03 <br /> P CN 4/1/04 500 100 600 600 No <br /> 3rd Avenue SE Street Improvements T <br /> 3rd Avenue SE 0 <br /> 92nd Street SE to 95th Street SE <br /> Design and construct street improvements Totals 500 100 600 600 <br /> 19 27 2 phases in project 05 P 0.28 C PE 7/1/02 80 80 80 <br /> P CN 5/1/03 500 500 500 No <br /> California Street Improvements T <br /> California Street 0 <br /> Virginia Avenue to Maple Street <br /> Totals 580 580 80 500 <br /> 19 28 2 phases in project 05 P 1.7 C PE 8/1/03 50 50 50 <br /> P CN 6/1/04 250 250 250 Yes <br /> Upper Ridge&Lower Ridge Rd.street improvemt. T <br /> Upper Ridge,Lower Ridge,74th St.,76th St 0 <br /> Beverly Lane to 78th Street <br /> Construct street and sidewalk improvements Totals 300 300 50 250 <br />
The URL can be used to link to this page
Your browser does not support the video tag.