My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 5067
>
Resolutions
>
Resolution 5067
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2017 9:35:50 AM
Creation date
2/23/2017 9:35:23 AM
Metadata
Fields
Template:
Resolutions
Resolution Number
5067
Date
6/27/2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Agency Everett SIX YEAR TRANSPORTATION IMPROVEMENT PLAN Page 8 From 2002 to 2007 <br /> County No. 31 Hearing Date <br /> City No. 420 Adoption Date <br /> MPO PSRC Resolution No. <br /> Project Identification Project Costs in Thousands of Dollars Federally Funded <br /> A. Federal Aid No. Fund Source Information Expenditure Schedule Projects Only <br /> B. Bridge No. Federal Funding 1 Local Agency <br /> C. Project Title R/W <br /> Fund- D. Street/County Road Name or Number Improve- Phase Federal Federal State 4th Required <br /> tional Priority E. Beginning MP or road-Ending MP or road men/ Total Utility Project Start Fund Cost by Fund State Local Total 1st 2nd 3rd thru Envir. Date <br /> Class Number F. Describe Work to be Done Type Status Length Codes Phase (mm/dd/yy) Code Phase Code Funds Funds Funds (2002) (2003) (2004) 6th Type (MM/YY) <br /> 1 2 3 4 5 6 7 6 9 10 11 12 13 14 15 16 17 18 19 20 21 <br /> 19 17 2 phases in project 6 P ' 00 0 PE <br /> CN 5/1/02 360 360 60 60 60 180 No <br /> Pedestrian Improvements (City-wide) <br /> Various locations within City limits <br /> Various streets to Various streets <br /> Design,construct new and rehab.Existing sidewalks Totals 360 360 60 60 60 180 <br /> 19 18 1 phase in project 12 P 00 C CN 7/1/02 120 120 20 20 20 60 <br /> P No <br /> Roadway Hazard Elimination Projects-city-wide T <br /> Various locations within City limits 0 <br /> Various streets to Various streets <br /> Remove and/or modify roadside hazards Totals 120 120 20 20 20 60 _ <br /> 19 19 2 phases in project 05 P 0.3 C PE 6/1/03 25 25 25 <br /> Port of Everett is Lead Agency 0 CN 6/1/04 175 175 175 No <br /> Port of Everett Public Access Walkway <br /> . Port of Everett South Terminal-sewer easement <br /> Bond Street to Pigeon Creek#1 _ <br /> I <br /> Construct bike-ped trail _ Totals 200 200 25 175 <br /> 19 20 2 phases in project 5 P 0.3 C PE 1/1/04 PSMP 8 2 10 10 <br /> P CN 6/1/04 PSMP 92 23 115 115 No <br /> Olympic Drive Pedestrian Improvements T <br /> Olympic Drive 0 <br /> Mukilteo Boulevard to Park Place <br /> Design and construct sidewalk improvements Totals 100 25 125 125 <br /> 19 21 2 phases in project 32 S 0.42 P PE 4/1/02 70 70 140 140 CE <br /> Port of Everett is Lead Agency 0 CN 4/1/03 280 280 560 560 No <br /> 13th Street Bike/Pedestrian Improvements <br /> 13th Street <br /> West Marine View Drive to Waterfront <br /> Design and construct bicyde-ped.Improvements Totals 350 350 700 140 560 <br /> 19 22 2 phases in project 6 P 00 C PE 1/1/00 <br /> P CN 5/1/00 2,400 2,400 400 400 400 800 No <br /> Neighborhood Traffic Mitigation Studies-Projects T <br /> Various locations within City limits 0 <br /> Various streets <br /> Install traffic enhancements in Neighborhoods Totals 2,400 2,400 400 400 400 800 <br /> 19 23 2 phases in project 12 P 0 0 PE 1/1/05 STP(U) 500— 100 600 600 CE <br /> CN 1 4/1/06 STP(U) 870 130 1,000 1.000 No <br /> ITMS Upgrades <br /> various locations city-wide <br /> various traffic signals in Everett <br /> 1 ..' <br /> replace central system with ITMS compat.System _Totals 1,370 l i 230 1,600 1,600 <br />
The URL can be used to link to this page
Your browser does not support the video tag.