Laserfiche WebLink
CITY OF EVERETT <br /> 2002 TO 2007 SIX-YEAR TRANSPORTATION IMPROVEMENT PROGRAM <br /> Interstate Local Access <br /> 1. I-5 Corridor Improvement Study 1. Hoyt-Wetmore 1-way to 2-way street conversion <br /> 2. I-5 Median HOV Lanes & Auxiliary Lanes 2. Annual Street Overlays (city-wide) <br /> 3. I-5 /41St Street Interchange 3. Riverfront Walkway Phase 1 <br /> 4. 1-5 / 100th Street SE HOV access/undercrossing 4. Riverfront Walkway Overcrossing <br /> 5. I-5 / 112th Street SE Park& Ride, Flyer Stop, HOV Ramps 5. Riverfront Walkway Phase 2 <br /> 6. I-5 /US 2 Interchange 6. Traffic Signal Interconnect <br /> 7. I-5/Downtown Everett off-ramp reconfiguration 7. Pavement Marking Project <br /> 8. I-5/Smith Island Interchange 8. Snohomish River Bike-Pedestrian Bridge <br /> 9. 106th Place SE Improvements <br /> Freeways 10. Neighborhood Block Grants <br /> 1. SR 526/Hardeson Road Interchange 11. Traffic Signal Improvements <br /> 12. Developer Traffic Signals <br /> Principal Arterials 13. Interurban Trail,44th to 41st Street <br /> 1. 19th Avenue SE(SR 527)Improvements 14. 41st Street Bike-Ped Connector Study <br /> 2. Evergreen Way Widening, 112th St. SW to Airport 15.Railroad Crossing Safety Improvements <br /> 3. East Marine View Drive Improvements 16. Terminal Avenue Pedestrian Improvements <br /> 4. Evergreen Way Widening, 41st Street to 47th Street 17. Pedestrian Improvements(city-wide) <br /> 5. Broadway/Beverly Blvd. Intersection Improvements 18. Hazard Elimination & Safety Projects <br /> 6. Evergreen Way HOV Emphasis Improvements 19. Port of Everett Public Access Walkway <br /> 7. 19th Avenue SE HOV Treatments 20. Olympic Drive Pedestrian Improvements <br /> 8. Everett Mall Way Median Safety Treatments 21. 13th Street Bicycle-Pedestrian Improvements <br /> 9. Broadway Corridor Study 22. Neighborhood Traffic Mitigation Studies-Projects <br /> 10. Arterial Needs Study 23.ITMS Upgrades <br /> 24. Everett Non-Motorized Transp. Projects <br /> Minor Arterials 25. City Entryway landscaping and signs <br /> 1. 41st Street Overcrossing 26. 3`d Avenue SE Street improvements <br /> 2. 112th Street SW Street Improvements(Airport Rd/to SR 99) 27. California Street Improvements <br /> 3. 112th Street SW-SE Street Improvements(SR 99 to 3rd SE) 28. Upper& Lower Ridge Road Street Improv. <br /> 4. Riverfront Parkway <br /> 5. 112th Street SE Street Improvements(3rd Ave. SE to SR 527) <br /> 6. 116th Street SE Street Improvements <br /> 7. 100th Street SW Street Improvements <br /> Collector Arterials Transit <br /> 1. East Everett Park and Ride Improvements 1. Bus Replacements-2002 to 2007 <br /> 2. California Street Overcrossing 2. Vehicle Maintenance Capitalization <br /> 3. Everett Avenue BNSF Overcrossing 3. Regional Fare Coordination Project <br /> 4. 16th Street Improvements 4. Transit Operations & Maint. Facil. Siting Study <br /> 5. 37th Street Improvements 5. Boeing Mitigation Park& Ride Lots, 2002 <br /> 6. Holly Drive Pedestrian Improvements 6. Operations Support Vehicle Replacement <br /> 7. Smith Island Roadway Improvements <br /> HOV Projects <br /> 1. Everett Station Construction <br /> Projects shown in bold type were not included in 2. Everett Station Commuter Rail Improvements <br /> The City's 2001-2006 Six Year TIP 3. South Everett Transit Center <br /> 4. North Everett Transit Center <br /> 5. Implementation of State CTR Law <br />