Laserfiche WebLink
CITY OF EVERETT 2002 TO 2007 SIX YEAR TRANSPORTATION IMPROVEMENT PLAN <br /> PROJECT PRIO- PE RNV CONST. Est.2002-07 LEAD MAP <br /> TYPE RITY PROJECT NAME TERMINI , START START START ' Expenditures i AGENCY NO. <br /> Interstate 1 Interstate 5 Corridor Improv.Study 112th Street SE to 12th Street NE May.99 250,000 EVERETT 1 <br /> Interstate 2 1-5 Median HOV Lanes&Auxiliary Lanes SR 526 to US 2 Jan.99 Nov.01 Aug.03 75,000,000 • WSDOT 2 <br /> Interstate 3 1-5-41st Street Interchange 41st Street to US 2 Jan.02 Jan.03 Jan.04 25,000,000 • WSDOT 3 <br /> Interstate 4 I-5/100th Street SE HOV access/undercross 1-5 at 100th Street SE Sep.01 Aug.02 Feb.03 25,000,000 * EVERETT 4 <br /> Interstate 5 I-5 112th Street SE Direct Access HOV/P&R/Flyer st 1-5 at 112th Street SE Jan.99 Jan.02 Jan.03 25,705,000 SOUND TR. 5 • <br /> Interstate 6 1-5/US 2 Interchange 1-5 at US 2 Jan.04 Jun.04 Jun.05 35,000,000 * WSDOT 6 <br /> Interstate 7 1-5/Downtown Everett off-ramp reconfiguration Pacific Ave.,Hewitt Ave.,Everett Ave. Jan.05 Jun.05 Jun.07 35,000,000 • WSDOT 7 <br /> Interstate 8 1-5/Smith Island Interchange 1-5 at 112th Ave.NE or north of 12th Ave. Apr.05 Jun.06 May.07 25,000,000 * WSDOT 8 <br /> Freeways 1 SR 526/Hardeson Rd.Interchange study SR 526 at Hardeson Road Sep.02 250,000 • EVERETT 9 <br /> Principal Arterials 1 19th Avenue SE(SR 527)Improvements 112th Street SE to 132nd Street SE Mar.94 Jul.98 Jun.02 17,630,000 EVERETT 10 <br /> Principal Arterials 2 Evergreen Way Improvements 112th Street SW to Airport Road Apr.99 Jul.01 1,005,580 EVERETT 11 <br /> Principal Arterials 3 East Marine View Drive Improvements North Broadway to Interstate 5 May.00 Jun.01 Apr.03 12,000,000 • EVERETT 12 <br /> Principal Arterials 4 Evergreen Way Improvements 41st Street to 47th Street Sep.00 Oct.01 Jul.02 1,699,000 EVERETT 13 <br /> Principal Arterials 5 Broadway/Beverly Blvd.Intersection lmpr. So.Broadway at Beverly Blvd. Oct.00 Jun.02 750,000 EVERETT 14 <br /> Principal Arterials 6 Evergreen Way /SR 99 HOV Emphasis Madison St.to Airport Road Apr.01 Jun.02 481,000 EVERETT 15 <br /> Principal Arterials 7 19th Avenue SE HOV Treatments El Capitan Way to 132nd Street SE Jan.98 Aug.02 557,000 EVERETT 16 <br /> Principal Arterials 8 Everett Mall Way Median Safety(HES)Project 3rd Ave.SE to 7th Ave.SE May.01 Mar.02 170,000 EVERETT 17 <br /> Principal Arterials 9 Broadway Corridor Study 41st Street to Beverly Boulevard Feb.03 625,000 * EVERETT 18 <br /> Principal Arterials 10 Arterial Needs Study Various arterials within city limits Feb.04 500,000 • EVERETT <br /> Minor Arterials 1 41st Street Overcrossing 41st Street at So.3rd Avenue Jan.99 Sep.99 Jun.01 14,000,000 EVERETT 19 <br /> , <br /> Minor Arterials 2 112th Street SW Improvements Airport Road to Evergreen Way Feb.00 Jun.01 2,523,000 i EVERETT 20 <br /> Minor Arterials 3 112th Street SW-SE Improvements Evergreen Way to 3rd Avenue SE Jun.96 Jan.97 May.01 5,030,000 SNO.CNTY. 21 <br /> Minor Arterials 4 Riverfront Parkway r 41st Street to Lowell River Road Sep.01 Jun.03 7,300,000 • EVERETT 22 <br /> Minor Arterials 5 112th Street SE Improvements 3rd Avenue SE to 19th Avenue SE Jan.02 May.02 May.03 13,200,000 EVERETT 23 <br /> Minor Arterials 6 116th St.SE Improvements SR 527 to 35th Avenue SE May.03 Sep.03 May.04 3,743,000 Evt/Sno.Co 24 <br /> Minor Arterials 7 100th Street SW Improvements Airport Road to Evergreen Way Feb.03 _ Jun.04 2,550,000 • EVERETT 25 <br /> Collector Arterials 1 East Everett Park and Ride Improvements 36th Street at Interstate 5 May.03 Aug.03 Mar.04 6,000,000 • EVERETT 26 <br /> Collector Arterials 2 California Street Overcrossing W.Marine View Dr.-Terminal Ave. Jul.99 Jan.00 Jul.01 11,900,000 EVERETT 27 <br /> Collector Arterials 4 Everett Ave.BNSF Overcrossing East Grand Ave.to Railway Ave. Jun.04 Jun.05 10,000,000 • EVERETT 28 <br /> Collector Arterials 5 16th Street Improvements Maple Street to Walnut Street Jan.03 Jul.03 240,000 • EVERETT 29 <br /> Collector Arterials 6 37th Street Rucker Avenue to Wetmore Ave. Jun.03 Jun.04 399,000 • EVERETT 30 <br /> Collector Arterials 7 Holly Drive Pedestrian Improvements 100th Street SW to Airport Road Apr.02 Oct.02 May.03 367,000 EVERETT 31 <br /> Collector Arterials 8 Smith Island roadway improvements Various arterials on Smith Island Jan.05 Jan.06 Jul.06 500,000 • EVERETT 32 <br /> 359,374,580 <br /> * A portion or all of the funding for this project has not yet been committed. <br /> NOTE: Projects shown in bold type were not included in the 2001-2006 Six-Year TIP. , <br />