My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 5067
>
Resolutions
>
Resolution 5067
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2017 9:35:50 AM
Creation date
2/23/2017 9:35:23 AM
Metadata
Fields
Template:
Resolutions
Resolution Number
5067
Date
6/27/2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT 2002 TO 2007 SIX YEAR TRANSPORTATION IMPROVEMENT PLAN <br /> PROJECT PRIG- PE I R/W CONST. ; Est.2001-06 LEAD MAP <br /> TYPE RITY PROJECT NAME TERMINI START START START Expenditures AGENCY NO. <br /> Local Access 1 Hoyt-Wetmore one-way to 2-way conversion 19th St.,32nd(Hoyt),37th(Wetmore) Mar.01 Jan.02 783,000 EVERETT 33 <br /> Local Access 2 Annual Street Overlay Program Various streets within city limits Jan.02 Jul.02 10,770,000 EVERETT <br /> Local Access 3 Riverfront Walkway Phase 1 Lenora Street to Pacific Avenue May.02 55,000 EVERETT 34 <br /> Local Access 4 Riverfront Walkway Overcrossing Riverfront Walkway at BNSF Overcrossing Jun.01 May.03 500,000 EVERETT 34 <br /> 1 Local Access 5 Riverfront Walkway Phase 2 Pacific Avenue to East Marine View Dr. May.01 Sep.01 785,000 EVERETT 34 <br /> Local Access 6 Traffic Signal Interconnect Various locations within city limits May.02 240,000 EVERETT <br /> Local Access 7 Pavement Marking Project Various locations within city limits Jan.02 May.02 210,000 EVERETT <br /> Local Access 8 I-5/Snohomish River Ped.Bridge E.Marine View Drive to Langus Riv.Park Apr.01 Apr.04 2,745,000 * EVERETT 35 <br /> Local Access 9 106th Place SE Improvements 16th Avenue SE to 19th Avenue SE Jan.02 Jun.02 450,000 EVERETT 36 <br /> Local Access 10 Neighborhood Block Grants Various locations within city limits Jan.02 May.02 360,000 • EVERETT <br /> Local Access 11 Traffic Signal Improvements Various locations within city limits Jan.02 Jun.02 900,000 EVERETT <br /> Local Access 12 Developer Traffic Signals Various locations within city limits Mar.02 Sep.02 600,000 EVERETT <br /> Local Access 13 Interurban Trail completion 44th Street to 41st Street Apr.02 Jan.04 Jun.04 350,000 * EVERETT 37 <br /> Local Access 14 41st Street Connector Design Study Interurban Trail to Riverfront Walkway Jan.02 50,000 EVERETT 38 <br /> Local Access 15 Railroad crossing safety improvements various rail crossings Jan.02 Jun.02 550,000 BNSF <br /> Local Access 16 Terminal Avenue Ped.Improvements California Street to Bond Street Apr.02 Aug.03 200,000 * EVERETT 39 <br /> Local Access 17 Pedestrian Improvements(City-wide) Various locations within city limits May.02 360,000 EVERETT <br /> Local Access 18 Roadway Hazard Elimination Projects Various locations within city limits Jul.02 120,000 * EVERETT <br /> Local Access 19 Port of Everett Public Access Wlkwy. Bond Street to Pigeon Creek No.1 Jun.03 Jun.04 200,000 EVERETT 40 <br /> Local Access 20 Olympic Drive Ped.Improvements Mukilteo Boulevard to Park Place Jan.04 Jun.04 125,000 * EVERETT 41 <br /> Local Access 21 13th Street Bike-Ped Improvements W.Marine View Drive to Waterfront Apr.02 Apr.03 700,000 EVERETT 42 <br /> Local Access 22 Neighborhood Traffic Mitig.Studies-Projects Various locations within city limits Jan.02 May.02 2,400,000 * EVERETT <br /> Local Access 23 ITMS Upgrades Various signals in Everett Jan.05 Apr.06 1,600,000 * EVERETT <br /> Local Access 24 Everett Non-Motorized Projects Various locations within city limits May.02 Sep.03 600,000 * EVERETT <br /> Local Access 25 City Entryway Landscaping and Signs Various entry corridors into the City Mar.02 Jul.02 150,000 EVERETT <br /> Local Access 26 3rd Avenue SE Street Improvements 92nd Street SE to 95th Street SE Jan.03 Apr.04 600,000 * EVERETT 43 <br /> Local Access 27 California Street Improvements Virginia Avenue to Maple Street Jul.02 May.03 580,000 * EVERETT 44 <br /> Local Access 28 Upper&Lower Ridge Rd.str.improv. 74th Street to 78th Street Aug.03 Jun.04 300,000 * EVERETT 45 <br /> 27,283,000 <br /> * A portion or all of the funding for this project has not yet been committed. <br /> NOTE: Projects shown in bold type were not included in the 2001-2006 Six-Year TIP. <br />
The URL can be used to link to this page
Your browser does not support the video tag.