Laserfiche WebLink
Six Year Transportation Improvement Program <br /> Instructions for Completing the Form <br /> 8. Project Phase. Select the appropriate phase code of the project. <br /> PE - Preliminary Engineering only (or planning) <br /> RW - Right of Way or land acquisition only (or equipment purchase) <br /> CN - Construction only (or transit operating) <br /> ALL -All Phases from Preliminary Engineering through Construction <br /> 9. Phase Start Date. Enter the month/day/year in MM/DD/YY format that the selected <br /> phase of the project is actually expected to start. <br /> 10. Federal Fund Sources. Enter the Federal Fund Source code from the table. <br /> FTA Discretionary for Capital Expenditures <br /> BIA - Bureau of Indian Affairs 5309(Bus) - Bus <br /> BR - Bridge Replacement or Rehab. 5309(FG) - Fixed Guideways <br /> CMAQ - Congestion Mitigation Air Quality 5309(NS) - New Starts <br /> DEMO_ - ISTEA Demo Projects (Selected) 5310 - FTA Elderly/Disabled <br /> Discretionary - Ferry Boat Discretionary, Public 5311 - FTA Rural Areas <br /> Highway Lands, or Scenic Byways STP(C) - STP Statewide Competitive Program <br /> DOD - Department of Defense STP(E) - STP Transportation Enhancements <br /> IC - Interstate Construction STP(S) - STP Safety Including Hazard and RR <br /> IM - Interstate Maintenance STP(R) - STP Rural Regionally Selected <br /> NHS - National Highway System STP(U) -STP Urban Regionally Selected <br /> 5307 - FTA Urban Areas STP -STP All Other STP Projects Not Listed <br /> 11. Federal Cost. Enter the total federal cost (in thousands) of the phase regardless of when the funds will be <br /> spent. <br /> 12. State Fund Code. Enter the appropriate code for any of the listed funds to be used on this project. <br /> CAPP -County Arterial Preservation Program RAP - Rural Arterial Program <br /> TIA -Transportation Improvement Account UATA - Urban Arterial Trust Account <br /> PWTF - Public Works Trust Fund <br /> 13. State Funds. Enter all funds from the State Agencies (in thousands) of the phase regardless of when the <br /> funds will be spent. <br /> 14. Local Funds. Enter all the funds from Local Agencies (in thousands) of the phase regardless of when the funds <br /> will be spent. <br /> 15. Total Funds. Enter the sum of columns 10, 12, and 14. <br /> 16-19. Expenditure Schedule - (1st, 2nd, 3rd, 4th thru 6th years). Enter the estimated <br /> expenditures (in thousands) of dollars by year. This data is for Local Agency use only. <br /> 20. Environmental Data Type. Enter the type of environmental assessment that will be required for <br /> this project. This is required for Federally Funded projects only. <br /> EIS - Environmental Impact Statement Programmatic CE - Categorical Exclusion <br /> EA - Environmental Assessment Documented CE CE Documented by State or FHWA <br /> 21. R/VV Certification. Circle Y if Right of Way acquisition is required. If yes, Enter R/W <br /> Certification Date if known. This is required for Federally Funded projects only. <br />