Laserfiche WebLink
Agency Everett SIX YEAR TRANSPORTATION IMPROVEMENT PLAN Page 9 From 2001 to 2006 <br /> County No. 31 Hearing Date <br /> City No. 420 Adoption Date <br /> MPO PSRC Resolution No. <br /> Project Identification Project Costs in Thousands of Dollars Federally Funded <br /> A. Federal Aid No. Fund Source Information _ Expenditure Schedule Projects Only <br /> B. Bridge No. I Federal Funding Local Agency <br /> C. Project Title , RAN <br /> Func- ' D. Street/County Road Name or Number Improve- Phase Federal Federal State 4th Required <br /> tional Priority E. Beginning MP or road-Ending MP or road ment Total Utility Project Start Fund Cost by Fund State Local Total 1st 2nd 3rd 1 thru Envir. Date <br /> Class Nu Zberi F. Describe Work to be Done Type Status Length Codes Phase (mm/dd/yy) Code Phase Code Funds Funds Funds 6th Type (MM/YY) <br /> 1 3 4 5 -- 6 7 8 9 10 11 I 12 13 14 15 16 17 18 19 20 21 <br /> 19 19 I 2 phases in project 01 P 0.3 C PE 4/1/01 I 40 40 40. <br /> Port of Everett is Lead Agency P CN 8/1/01 ! 160 160 160 No <br /> Terminal Avenue Improvements T <br /> Terminal Avenue 0 <br /> ,California Street to Bond Street i 1 <br /> I <br /> Design and construct street&ped improvements Totals: 200 200 200 I <br /> 19 20 ' 2 phases in project 05 P 0.10 C PE 10/1/01 PSMP 20 5 25 25 <br /> I P CN 6/1/02 CDBG 90 PSMP 130 25 245 245 EA No <br /> Norton Avenue Pedestrian Improvements T <br /> Norton Avenue 0 <br /> Design <br /> Place to 41st Street <br /> Des" n and construct street and ped improvements Totals 150 30; 270 25 245 <br /> 19 i 21 2 phases in project 05 P 1 0.3 C PE 6/1/01 ,PSMP 8 21 10 10 <br /> P CN 6/1/02 PSMP I 92 231 115 115 No <br /> Olympic Drive Pedestrian Improvements T <br /> Olympic Drive 1 0 I <br /> Mukilteo Boulevard to Park Place <br /> I Design and construct sidewalk improvements 1 Totals - 100 25 125 10 115 <br /> 19 22 2 phases in project I 08 P 0.2 , PE 4/1/01 STP(E) 600 120 720 720 EA <br /> CN 6/1/02 1 IAC 300 1,100 1,400 2,150 No <br /> 1-5/Snohomish River Bicycle-Ped Bridge I ! ! ALEA 750 750 <br /> Interstate 5 <br /> East Marine View Drive to Langus Riv'ft.Park <br /> Design,construct bike-ped bridge over Snohomish River Totals 600 1,050 1,220 2,870 720 2,150 <br /> 19 23 2 phases in project 32 P 0.76 S PE 3/1/00 25 25 <br /> Port of Everett is Lead Agency 0 CN 10/1/03 175 175 No <br /> Port of Everett Public Access Walkway <br /> Port of Everett South Terminal-sewer easement ' <br /> Bond Street to Pigeon Creek#1 <br /> Construct bike-ped trail Totals 200 200 <br /> 19 24 2 phases in project 32 P 10.45 C PE 1/1/02 200, 200 200 EA <br /> P CN ' 6/1/02 STP(E) 800 700 1,500 1.500 No <br /> 41st Street Connector-Interurban to Riverfront ! T <br /> 41st Street 0 <br /> Interurban Trail terminus to Riverfront Parkway <br /> Design and construct bike-ped trail connector Totals 800 900 1,700 1,700 <br />