My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 4926
>
Resolutions
>
Resolution 4926
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2017 11:49:56 AM
Creation date
2/23/2017 11:49:28 AM
Metadata
Fields
Template:
Resolutions
Resolution Number
4926
Date
6/28/2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Agency Everett SIX YEAR TRANSPORTATION IMPROVEMENT PLAN Page 8 From 2001 to 2006 <br /> County No. 31 Hearing Date <br /> City No. 420 Adoption Date <br /> MPO PSRC Resolution No. <br /> Project Identification Project Costs in Thousands of Dollars Federally Funded <br /> A. Federal Aid No. Fund Source Information Expenditure Schedule Projects Only <br /> B. Bridge No. Federal Funding Local Agency <br /> C. Project Title R/W <br /> Func- D. Street/County Road Name or Number mprove- Phase Federal Federal' State 4th Required <br /> tional Priority E. Beginning MP or road-Ending MP or road ment 1 Total Utility Project Start Fund Cost byl Fund State Local Total 1st 2nd 3rd thru Envir. Date <br /> Class Number F. Describe Work to be Done Type Status Length Codes Phase (mm/dd/yy) Code , Phase Code Funds Funds Funds 6th Type (MM/YY) <br /> 1 2 3 4--: 5 6 7 8 9 10 I 12 • 13 14 15 16 17 18 -----19 -_-20 -_--21 <br /> 19 13 STPE-0420(002) 1 phase in project 32 S 2 P CN 5/1/01 STP(E)! 441 I 11 55 55 CE <br /> ' 0 I I No <br /> Riverfront Walkway Phase I i <br /> Riverfront Walkway i <br /> Lenora Street to Pacific Avenue ' _ <br /> Construct bicycle-ped path along Snohomish River ', ITotals 44. 11 55 55 <br /> 19 14 STPE-EN94(013) 1 phase in project 1 32 S 0.10 . CN 5/1/01 STP(E) 400 100' 500 100' 400. EA <br /> No <br /> Riverfront Walkway Overcrossing <br /> Riverfront Walkway <br /> BNSF Overcrossing to BNSF Overcrossing <br /> Construct pedestrian overcrossing of BNSF Railway Totals' 4001 100 500 100 400 <br /> 19 15 STPE-EN94(014) 2 phases in project 32 S 3.6 P PE 9/1/00 STP(E) 841 21 105 105 CE <br /> O CN 9/1/01 675''1 110' 785 785 No <br /> Riverfront Walkway Phase II <br /> Pacific Ave.,E.Grand Ave.,E.Marine View Drive I <br /> Pacific Ave./Smith Ave. To North Broadway <br /> Design and construct bicycle-pedestrian path 1 _Totals 131 890 890 <br /> 7591 <br /> 19 16 2 phases in project 32 S 0.42 P PE 4/1/00 701 70. 140 140 CE <br /> Port of Everett is Lead Agency , 0 CN ' 4/1/01 280, 280 560 560 No <br /> 13th Street Bike/Pedestrian Improvements <br /> 13th Street <br /> West Marine View Drive to Waterfront <br /> Design and construct bicycle-ped.improvements I Totals 350' 350 700 700 <br /> 19 17 2 phases in project 05 S ' 0.2 C PE 9/1/00 PSMP I 8 2 10 10 <br /> P CN 6/1/01 PSMP 74 18 92 No <br /> 10th Street Pedestrian Improvements T I <br /> 10th Street 0 <br /> Pine Street to East Marine View Drive <br /> Design,construct street-sidewalk improvements Totals 82 20 102 102 <br /> 19 18 3 phases in project 01 P 0.1 C PE 8/1/00 100 100 100 <br /> S RW 1/1/01 50 50 50 Yes <br /> 106th Place SE Improvements G CN 6/1/01 350 350 350 <br /> 106th Place SE P <br /> 16th Avenue SE to 19th Avenue SE(SR 527) T <br /> Design and construct street&signal improvements W Totals 350 350 350 <br />
The URL can be used to link to this page
Your browser does not support the video tag.