My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 4926
>
Resolutions
>
Resolution 4926
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2017 11:49:56 AM
Creation date
2/23/2017 11:49:28 AM
Metadata
Fields
Template:
Resolutions
Resolution Number
4926
Date
6/28/2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Washington State Department of Transportation Six Year Transportation Improvement Plan <br /> Agency Everett Page 12 From 2001 to 2006 <br /> County No. 31 Hearing Date <br /> City No. 420 Adoption Date <br /> MPO PSRC Resolution No. <br /> Project Identification ' Project Costs in Thousands of Dollars Federally Funded <br /> A. Federal Aid No. Fund Source Information Expenditure Schedule Projects Only <br /> B. Bridge No. Federal Funding Local Agency <br /> C. Project Title R/W <br /> Func- D. Street/County Road Name or Number Improve- Phase Federal Federal State 4th Required <br /> tional Priority E. Beginning MP or road-Ending MP or road ment Total Utility Project Start Fund Cost by Fund State Local Total 1st 2nd 3rd thru Envir. Date <br /> Class Number F. Describe Work to be Done Type Status Length Codes Phase (mm/dd/yy) Code Phase Code Funds Funds Funds 6th Type (MM/YY) <br /> 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 <br /> 1 1 phase in project 21 P ALL 1/1/04 5307 1,560 390 1,950 1,950 No <br /> Bus Replacements:2004,approx.6 HD buses <br /> Totals; 1,560 390' 1,950 I 1 [1,950 <br /> 1 1 phase in project 21 P ALL 6/1/06 5307 1,040 260 1,300 1,300 No <br /> Bus Replacements:2006,approx.12 PT buses <br /> Totals r 1,0401 26011,300 11,300 <br /> 1 1 phase in project 21 S ALL 10/1/99 5307 1,358 340 1,698 283 283 283 849 No <br /> Vehicle Maintenance Capitalization <br /> Transit maintenance and preservation activities <br /> Totals; 1,358; I 1 340I 1,698 283; 283 283; 849 <br /> 2 1 phase in project 23 S PE 1/1/97 CMAQ 252 39 291 49 49 49 144 No <br /> Regional Fare Coordination Project(Smart Card) <br /> Totals 1,0201 391 291 491 491 49r 144 <br /> 2 1 phase in project 23 P PE 1/1/02 5307 480 120 600 200 400 No <br /> Transit Operations and Maintenance Facility <br /> Siting Study <br /> Totals 480 120 600 I 200 4001 <br /> 2 1 phase in project 21 S CN 5/1/94 1,000 1,000 200 200 200 400 No <br /> Boeing Mitigation Park and Ride Lots <br /> Totals I1 1,00011,000 200: 2001 200: 400 <br /> 3 1 phase in project 21 P ALL 1/1/01 Discre- 28 7 35 35 No <br /> tionary <br /> Operations Support Vehicle Replacement <br /> Totals:f : 1 281 1 1 71 35 35: 1 F <br />
The URL can be used to link to this page
Your browser does not support the video tag.