Laserfiche WebLink
Washington State Department of Transportation Six Year Transportation Improvement Plan <br /> Agency Everett Page 13 From 2001 to 2006 <br /> County No. 31 Hearing Date <br /> City No. 420 Adoption Date <br /> MPO PSRC Resolution No. <br /> Project Identification Project Costs in Thousands of Dollars Federally Funded <br /> A. Federal Aid No. Fund Source Information Expenditure Schedule Projects Only <br /> B. Bridge No. Federal Funding Local Agency <br /> C. Project Title R/W <br /> Func- D. Street/County Road Name or Number Improve- Phase Federal Federal State 4th Required <br /> tional Priority E. Beginning MP or road-Ending MP or road ment Total Utility Project Start Fund Cost by Fund State Local Total 1st 2nd 3rd thru Envir. Date <br /> Class Number F. Describe Work to be Done Type Status Length Codes Phase(mm/dd/yy) Code Phase Code Funds Funds Funds Year Year Year 6th Type (MM/YY) <br /> 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 <br /> 1 1 phase in project 21 S CN 7/1/00 EA No <br /> Everett Station Constr.,exclud.Commuer Rail <br /> Smith Avenue and Pacific Avenue <br /> Totals i 28,000 � 1 • <br /> 1 1 phase in project 21 S CN 7/1/00 15,504 15,504 No <br /> (Sound <br /> Everett Station Commuter Rail(Sound Transit) Trans.) <br /> Smith Avenue and Pacific Avenue <br /> Totals I 115,504;15,504 <br /> 1 1 phase in project 21 S PE 7/1/00 5307 388 96 484 242 242 No <br /> 136 136 68 68 <br /> South Everett Transit Center Design (Sound <br /> Everett Mall Way Area Transit) <br /> Totals; . i I 2321 620 3101 3101 , <br /> 1 1 phase in project 21 S RW 11/1/00 1,127 1,127 282 282 282 281 Yes <br /> (Sound Nov-00 <br /> South Everett Transit Center,Right-of-way Transit) <br /> Everett Mall Way Area 41 <br /> Totals: i I I I f 1,127¢1,127 282: 2821 282: 281 <br /> 1 1 phase in project 21 S CN 1/1/01 5307 1,216 283 1,499 375 375 375 374 No <br /> South Everett Transit Center,Construction <br /> Everett Mall Way Area <br /> Totals 1,2161 T F 283T 1,499 3751 3751 375r 374 <br /> 1 1 phase in project 21 P CN 1/1/01 1,516 1,516 379 379 379 379 No <br /> (Sound <br /> South Everett Transit Center,Construction Transit) <br /> Everett Mall Way Area <br /> Totals; 1 1,516 379; 379; 379; 379 <br />