My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 4926
>
Resolutions
>
Resolution 4926
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2017 11:49:56 AM
Creation date
2/23/2017 11:49:28 AM
Metadata
Fields
Template:
Resolutions
Resolution Number
4926
Date
6/28/2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Washington State Department of Transportation Page 1 Six Year Transportation Improvement Program <br /> Agency Everett From 2001 to 2006 <br /> County No. 31 Hearing Date <br /> City No. 420 Adoption Date <br /> MPO PSRC Resolution No. <br /> Project Identification Project Costs in Thousands of Dollars - Federally Funded <br /> A. Federal Aid No. Fund Source Information Expenditure Schedule Projects Only <br /> B. Bridge No. r Federal Funding Local Agency - <br /> C. Project Title R/VV <br /> D. Street/County Road Name or Number Improve- Phase Federal Federal' State 4th Required <br /> Functional Priority E. Beginning MP or road-Ending MP or road ment Total Utility Project Start Fund Cost by Fund State Local Total 1st 2nd 3rd thru Envir. Date <br /> Class ,Number F. Describe Work to be Done Type :Status Length:Codes Phase (mm/dd/yy) Code Phase Code Funds Funds Funds 6th Type (MM/YY) <br /> 1 ' 2 3 14 5 i 6 • 7 8 I 9 10 11 • 12 • 13 14 • 15 16 17 18 19 20 21._-- <br /> 11 ' 1 STPUL-1998(017) 2 phases in project 31 S I 8 PE 5/1/99 DEMO 1,000 250 1250 935 CE No <br /> .various � PE 5/1/99 STP(U) 247 38 285 <br /> Interstate 5 Corridor Improvement Study <br /> ' 1-5 ' <br /> 112th St.SE to 12th St.NE <br /> Design Report and Environmental Review of 1-5 corridor Totals 1,247 288 1,535 935 <br /> 11 2 3 phases in project 4 S 5.6 0 PE 1/1/99 <br /> various I RW 11/1/00Yes <br /> I-5 Median HOV Lanes and Auxiliary Lanes , CN 8/1/03 170,000 70,000 3,500 3,500 31500 31500 <br /> 1-5 <br /> SR <br /> 26 <br /> t <br /> Design and co construct ct Median HOV lanes and GP aux. • <br /> , Totals T 70,000 70,000 3,500' 3,500.31500 <br /> 931500 <br /> 11 3 3 phases in project 3 P 0.1 I 0 PE j 1/1/01 , <br /> 5/630 RW 1/1/02 ' Yes <br /> 1-5/41st Street SE Interchange CN Jan-03 125000. 25000 2000 2000 6000 15000 <br /> 1-5,41st StreetI <br /> 1-5 at 41st Street to 1-5 at 41st Street ' <br /> Design and construct Interchange Improvements Totals 25000 25000 2000 2000 6000 15000 <br /> 11 4 3 phases in project 3 P 0.1O PE 9/1/00 <br /> I RW 8/1/02 Yes <br /> 1-5/100th Street SE HOV Access/undercrossing CN 2/1/03 15,000 500' 1,000'13500 <br /> 1-5,100th Street SE <br /> 1-5/100th Street SE to 1-5/100th Street SE <br /> Design and construct HOV access/undercrossing Totals 15,000 500 1,000 13500' <br /> 11 5 3 phases in project 3 P 0.1 0 PE 1/1/99 <br /> 5/620 I RW 1/1/00 Yes <br /> I-5/112th Street SE Direct Access HOV Ramps ALL 1/1/02 <br /> 1-5,112th Street SE 7,384 7.384 384 1,000 1,000 5,000 <br /> 1-5/112th Street SE to I-5/112th Street SE <br /> Design and Construct Direct Access HOV Ramps Totals 7,384 7,384 384 1,000 1,000 5,000 <br /> 11 6 3 phases in project 3 S 0.1 0 PE 1/1/99 <br /> 5/620 RW 1/1/00 Yes <br /> I-5/112th Street SE Park and Ride/Flyer Stop CN 1/1/02 17,487 17,487 5,000 5,000 7,487 <br /> 1-5,112th Street SE <br /> I-5/112th Street SE to I-5/112th Street SE <br /> Design and Construct Median Park and Ride Lot and Flyer Totals 17,487 17,487 5,000 5,000 7,487 <br />
The URL can be used to link to this page
Your browser does not support the video tag.