Laserfiche WebLink
Washington State Department of Transportation Page 2 Six Year Transportation Improvement Program <br /> Agency Everett From 2001 to 2006 <br /> County No. 31 Hearing Date <br /> City No. 420 Adoption Date <br /> MPO PSRC Resolution No. <br /> Project Identification Project Costs in Thousands of Dollars _ Federally Funded <br /> A. Federal Aid No. Fund Source Information _ Expenditure Schedule Projects Only <br /> B. Bridge No. Federal Funding Local Agency <br /> C. Project Title RNV <br /> Func- D. Street/County Road Name or Number Improve- Phase Federal Federal', State 4th Required <br /> tional Priority E. Beginning MP or road-Ending MP or road ment Total Utility Project Start Fund Cost byi Fund State Local Total 1st 2nd 3rd thru Envir. Date <br /> Class 'Number F. Describe Work to be Done Type Status Length!Codes Phase (mm/dd/yy) Code ' Phase Code Funds Funds Funds 6th Type (MM/YY) <br /> 1 2 3 _. 4 5 6 7 8 9 10 1 11 12 13 14 15 16 1 17 18 19 20 21 <br /> 11 7 3 phases in project i 3 P 0.3 0 PE 1/1/01 I <br /> '5/640 RW 1/1/02 Yes <br /> I-5/US 2 Interchange CN 1/1/03 i i <br /> 1 1 25,000 i 25,000 2,500 2,500 20,000 <br /> 1-5,US 2,Hewitt Avenue,Everett Avenue <br /> 1-5 at US 2 Interchange to 1-5 at US 2 Interchange <br /> Improve On-ramps,Local Arterials,8 Interchange Totals 25,0001 125,000 2,5001 2,5001 20,000 <br /> 12 1 1 phase in project 31 P 0 PE 9/1/00 I 250 250 250 I <br /> 526/14 No <br /> SR 526/Hardeson Road Interchange Study , <br /> SR 526 and Hardeson Road <br /> SR 526/Hardeson Rd. To SR 526/Hardeson Rd. <br /> •Study possible interchange improvements Totals 250 250 250 <br /> 14 1 4 phases in project 4 P 1.5 C PE 3/1/94 <br /> P RW 7/1/98 Yes <br /> 19th Avenue SE(SR 527)Improvements T CN 6/1/01 TIA 6,584 1,216 7,800 2,770 3,400 <br /> ' ;19th Avenue SE(SR 527) 0 CN 6/1/01 i 9,830 1 9,830 4,915 4,915 <br /> 112th Street SE to 132nd Street SE I <br /> Design and construct addit.lanes,signal improv.,etc. Totals 16,414 1,216 17,630 7,6851 8,3151 <br /> 14 2 HP-1998(021) 4 phases in project 4 Status 1.5 C PE 5/1/00 DEMO 732 183 915 9151 EA <br /> P RW 6/1/01 DEMO 592 148 740 740 Yes <br /> East Marine View Drive Improvements T CN 4/1/02 DEMO 3.576 269 3,845 4,445 <br /> East Marine View Drive 0 CN 600 600 6/1/99 <br /> North Broadway to Interstate 5 I <br /> Design,construct roadway widening and improvements I Totals 4,900' 600 600 6,100 1655 4,445 <br /> 14 3 4 phases in project 8 S 0.1 C PE 5/1/99 2,810 2,810 <br /> P RW 10/1/99 800 800 400 Yes <br /> Pacific Avenue Overcrossing T CN I 6/1/00 18,630,18,630 fo,CoD 8,630' I <br /> Pacific Avenue Overcrossing 0 CN i 6/1/00 STP(U) 7,400 7,400 2,000• <br /> McDougall Avenue to Fulton Avenue <br /> Design,construct grade separated arterial overcrossing Totals 7,400 22,240 Z9,4A0 1040, 10,6301 <br /> 14 4 2 phases in project 4 S 0.55 C PE 4/1/99 28 28 56 • <br /> P CN I 7/1/00 TIA 387 386 773 386 No <br /> Evergreen Way Imrpov.(HOV-Emph.Lane Widen.) T <br /> Evergreen Way 0 <br /> • <br /> 112th Street to Airport Road <br /> Design and construct rosdway widening to seven lanes Totals 415 414 829 386 <br />