|
Washington State Department of Transportation Page 2 Six Year Transportation Improvement Program
<br /> Agency Everett From 2001 to 2006
<br /> County No. 31 Hearing Date
<br /> City No. 420 Adoption Date
<br /> MPO PSRC Resolution No.
<br /> Project Identification Project Costs in Thousands of Dollars _ Federally Funded
<br /> A. Federal Aid No. Fund Source Information _ Expenditure Schedule Projects Only
<br /> B. Bridge No. Federal Funding Local Agency
<br /> C. Project Title RNV
<br /> Func- D. Street/County Road Name or Number Improve- Phase Federal Federal', State 4th Required
<br /> tional Priority E. Beginning MP or road-Ending MP or road ment Total Utility Project Start Fund Cost byi Fund State Local Total 1st 2nd 3rd thru Envir. Date
<br /> Class 'Number F. Describe Work to be Done Type Status Length!Codes Phase (mm/dd/yy) Code ' Phase Code Funds Funds Funds 6th Type (MM/YY)
<br /> 1 2 3 _. 4 5 6 7 8 9 10 1 11 12 13 14 15 16 1 17 18 19 20 21
<br /> 11 7 3 phases in project i 3 P 0.3 0 PE 1/1/01 I
<br /> '5/640 RW 1/1/02 Yes
<br /> I-5/US 2 Interchange CN 1/1/03 i i
<br /> 1 1 25,000 i 25,000 2,500 2,500 20,000
<br /> 1-5,US 2,Hewitt Avenue,Everett Avenue
<br /> 1-5 at US 2 Interchange to 1-5 at US 2 Interchange
<br /> Improve On-ramps,Local Arterials,8 Interchange Totals 25,0001 125,000 2,5001 2,5001 20,000
<br /> 12 1 1 phase in project 31 P 0 PE 9/1/00 I 250 250 250 I
<br /> 526/14 No
<br /> SR 526/Hardeson Road Interchange Study ,
<br /> SR 526 and Hardeson Road
<br /> SR 526/Hardeson Rd. To SR 526/Hardeson Rd.
<br /> •Study possible interchange improvements Totals 250 250 250
<br /> 14 1 4 phases in project 4 P 1.5 C PE 3/1/94
<br /> P RW 7/1/98 Yes
<br /> 19th Avenue SE(SR 527)Improvements T CN 6/1/01 TIA 6,584 1,216 7,800 2,770 3,400
<br /> ' ;19th Avenue SE(SR 527) 0 CN 6/1/01 i 9,830 1 9,830 4,915 4,915
<br /> 112th Street SE to 132nd Street SE I
<br /> Design and construct addit.lanes,signal improv.,etc. Totals 16,414 1,216 17,630 7,6851 8,3151
<br /> 14 2 HP-1998(021) 4 phases in project 4 Status 1.5 C PE 5/1/00 DEMO 732 183 915 9151 EA
<br /> P RW 6/1/01 DEMO 592 148 740 740 Yes
<br /> East Marine View Drive Improvements T CN 4/1/02 DEMO 3.576 269 3,845 4,445
<br /> East Marine View Drive 0 CN 600 600 6/1/99
<br /> North Broadway to Interstate 5 I
<br /> Design,construct roadway widening and improvements I Totals 4,900' 600 600 6,100 1655 4,445
<br /> 14 3 4 phases in project 8 S 0.1 C PE 5/1/99 2,810 2,810
<br /> P RW 10/1/99 800 800 400 Yes
<br /> Pacific Avenue Overcrossing T CN I 6/1/00 18,630,18,630 fo,CoD 8,630' I
<br /> Pacific Avenue Overcrossing 0 CN i 6/1/00 STP(U) 7,400 7,400 2,000•
<br /> McDougall Avenue to Fulton Avenue
<br /> Design,construct grade separated arterial overcrossing Totals 7,400 22,240 Z9,4A0 1040, 10,6301
<br /> 14 4 2 phases in project 4 S 0.55 C PE 4/1/99 28 28 56 •
<br /> P CN I 7/1/00 TIA 387 386 773 386 No
<br /> Evergreen Way Imrpov.(HOV-Emph.Lane Widen.) T
<br /> Evergreen Way 0
<br /> •
<br /> 112th Street to Airport Road
<br /> Design and construct rosdway widening to seven lanes Totals 415 414 829 386
<br />
|