Laserfiche WebLink
4229 76°i Sl.NE <br /> Marysville,WA 98270 � . � � � <br /> Phone(360)651-5709 <br /> FAX (360)657-4779 <br /> ebergwaQvenzon.net <br /> May 18, 2006 �wd�d� d � l <br /> Gordon Witcher <br /> Development and Permits <br /> City of Everett <br /> 3200 Cedar Street <br /> Everett, WA 98201 <br /> Re: Construction Plans — Paine Field Way Cottages <br /> SEPA#05-056 - 2"d Submittal <br /> For: Walter Kjorsvik <br /> Dear Gordon: <br /> Please find atlached 4 sels of revised plan sheets & 1 revised Drainage report letter & <br /> attachments addressing tlie Cily's first review comments. I am also returning the 2 <br /> markup rolis and marked up drainage report. <br /> Rasponse to Comments <br /> 1. (GW- C1) Water& Sewer Approval - Mukilteo Water Dist. As we discussed <br /> on the phone, I talked to Mary Merrian at the Mukilteo Water District who s: ;ted <br /> that the Water & Sewer plans for this project are under the City of Ev„�etPs <br /> jurisdiction and that the W/S should be submitted to Ciry of Everett for approval. <br /> Tfiis slieets are included in this submittal. Because all utilities will 6e under <br /> Everett's jurisdiction, 1 have renum6ered the sheets to include all sheets in to the <br /> "C"sheets except the Landscaping sheet which will still be "L1" <br /> 2. (GW - C41 Mike Bricks comments. I met with Mike Brick on 5/2/O6 and <br /> discussed his comrrients. Walter also attended this meeting. The widening to 20 <br /> feet (or tlie internal roads and addition of some sidewalk requested by Mike is <br /> inch�ded �vith this submittal. Mike said the crosswalks did not need to be added. <br /> Tlie volume increase due to these added impervious areas was added to the <br /> drainage analysis and WS adjusted. (See drainage report.). <br /> 3. (JZ - C11 Rock Wall & R/W encroachment comments. The vegetated <br /> treatmen; cell and tlie vaulbvegetated treatment cell access road have both been <br /> moved to outside the R/W. This also eliminates the need for the su6ject rock <br /> walf at the vegetated treatment cell. <br /> 4. {JZ - C3) Veqetated Treatment Cell Baffle & Geotech note. As discussed in <br /> 3., above, tlie vegetated treatment cell was moved northerly away from the 112'h <br /> St block wall out of the R/W. The catch point for the 3:1 slope from the <br /> vegetated treatment cell is now -26 feet from the toe of the subject 112'" block <br /> wall. Accordingly, the geotechnical note was removed. If the City feels that a <br /> special geotechnical review is necessary, an investigation and letter can be <br /> provided belore final approval of the plans. �r , <br /> \C% <br />