My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11126 PAINE FIELD WAY 2016-01-01 MF Import
>
Address Records
>
PAINE FIELD WAY
>
11126
>
11126 PAINE FIELD WAY 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2017 9:47:19 AM
Creation date
2/24/2017 9:46:52 AM
Metadata
Fields
Template:
Address Document
Street Name
PAINE FIELD WAY
Street Number
11126
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
168
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5. (JZ — C4) Vault access, separate tax aarcel, detail of p(p@ crossinq. <br /> hatchina, access qate, access to vault, off site CB 8 connection to vault. <br /> • Section BB extended to better show vault access <br /> • Easements are being drawn up byASPI(or offsite properties. <br /> • The pipe crossing in question is shown on the applicable sanitary& storm <br /> sewer <br /> • Proliles located on new sheets C-8 and C-5 respectively. <br /> • A 16-foot access gate is now shown on the plans. <br /> • Surfacing is now shown on the plans for the vauft access road. <br /> • The new off-site catch basin (C818) from the O'Connor property is now <br /> shown to be constructed with this project. <br /> • Hatching denoted landscape buffer. <br /> 6. (JZ— C5) 12"SD or 6"SD, sanitarv sewer pipe crossinq. Sform pipe size frori <br /> C611 — C811A — C612 changed to 6"SD. The sanitary sewer pipe crossing is <br /> now shown between C811 and C811A. <br /> 7. (JZ — C6) Cross Section AA & BB switch, "Equalfzer" note, speciN vault <br /> floor elevation, need 3:1 side slopes for veaetated treatment cell . <br /> • Sections AA & 86 on this sheet OK. C4 was corrected fo mafch.. <br /> • Baf(le opening clariCed. <br /> • Vault(Ioor elevation specifically called out. <br /> • 3:1 side slopes now provided for vegetated treatttient cell. <br /> 8. (JZ — Drainaqe Report) Show staqe storaqe relationship of the storeqe <br /> structures. Now included in the attached revised drainage report. The volumes <br /> were changed somewhat to reflect the additional impervious resulting (rom the <br /> �videning requested by Mike Bricks. <br /> Sincerely, <br /> �. � <br /> Ernest L. Berc�, P./�E. " <br /> Berg Engineering <br /> Attachments <br /> 7� <br />
The URL can be used to link to this page
Your browser does not support the video tag.