Laserfiche WebLink
l Page I 1 of 1 f <br /> and/or riser conduit to accommodate Verizon's network communications cable within the complex. <br /> Provided that an acceptable combination of conduit and/or trenching is incorporated into the <br /> project to accommodate Verizon's entrance cable, there will be no costs to the developer for <br /> Verizon's cable. <br /> 6. If a rearrangement of existing cables on premises or on the right-of-way is necessary, appropriate <br /> charges will be estimated and Verizon's Guaranty of Payment form will be forvvarded to you for <br /> your signature. Prior to commencement of Verizon's engineering for such rearrangement, a <br /> deposit will be required. To insure timely te:ephone service, Verizon requests ninety (90) days <br /> lead time for engineering, procurement, and installation of cable and/or Verizon's equipment. <br /> Please contact Michael Hupf, Engineer, at (425)356-4052 or Mike Bly, Engineer al (425)356-4034 <br /> should you require additional information. <br /> S:\FSiddiqlWINWORDISEPA105-056 PFVJay Cotlage Homes.doc <br /> � <br /> I/6/200G <br />