Laserfiche WebLink
• Staking of miligation boundaries <br /> • Installation of temporary erosion and sedimentation control measures prior to <br /> commencement of any clearing or earthwork <br /> • Clearing and grubbing, over-excavation of wetlands and mitigation area, stockpiling of <br /> wetland soil materials, and conlained root- and seed stock <br /> • All exposed ground must be reseeded within 30 days of the completion of construction. If <br /> reseeding is not practical due lo weather or seasonal problems, the ground must be <br /> covered with mulch as directed by the City Engineer. <br /> • Replacement of soil materials <br /> • Implemenlation of Bu(fer Reduction Plan dated September S, 2005 <br /> 2. The applicant shall provide a performance securily bond in lhe amount of 300 percent of <br /> the estimated cost of implemenling the Final Wetland Mitigation Plan. This bond is <br /> payable to the City of Everett in order to ensure that all costs for construction, monitoring, <br /> mainlenance, and contingencies will be met during the monitoring period. <br /> You may appeal this determination by filing an appeal on forms provided by lhe Planning <br /> Department and a fee to the PlanninglCommunity Development Permit Services Counter at 3200 <br /> Cedar Street, 2nd Floor, no later than 14 days from the date the MDNS becomes final (which is <br /> after the 14-day comment period). <br /> Responsible <br /> Official: Allan Giffen <br /> Title: Planning and Community Developmenl Director <br /> Address: 2930 Wetmore Avenue, Suite 8-A, Everett,WA 98201 <br /> Date: January 13, 2006 , <br /> Signature: <br /> Contact Faheem Siddiq lo read or ask aboul the procedures for SEPA appeals. <br /> NOTE: A DNS may be withdrawn in the event o( significant changes in lhe proposal, disclosure of <br /> new signiflcant information, misrepresentation by the applicant, or failure to comply with <br /> the conditions upon which this Determination of Non-Significance is predicated. <br /> ,�..:' <br /> al` <br />