Laserfiche WebLink
b <br /> Mr. Jim Ozanne,P.E. Page 3 <br /> City of Everett, Washington March 24, 2006 <br /> • Contract Administration <br /> • Resident Project Representation <br /> • First Anniversary Evaluation <br /> 200,000 Gallon Olympic Elevated Ellipsoidal Tank <br /> • Evaluation <br /> • Seismic Analysis <br /> • Structural Analysis <br /> • Design and Specification for Seismic Upgrade and Cleaning and Repainting <br /> • Contract Administration <br /> • Bidding Services <br /> • Field Verification of Site Elements <br /> • Construability Analysis <br /> • Resident Project Representation during Seismic Retrofit <br /> 200,000 Gallon Filtration Plant Standpipe <br /> • Evaluation <br /> • Seismic Analysis <br /> Tunnel#2 Surge Chamber <br /> • Evaluation <br /> Portal 6 Penstock <br /> • Evaluation <br /> Portal 6 Lines 2, 3,&4 <br /> • Evaluation <br /> We look forward to continuing our very successful working relationship with you and the others <br /> at the City. Please contact me if you have any questions or need additional information to <br /> complete your evaluations of the proposal. <br /> Sincerely, <br /> Tank Industry Consultants <br /> Stephen W. Meier, P.E., S.E. <br /> Vice President—Engineering and Technology <br /> 18 <br />