Laserfiche WebLink
6 <br /> Mr. Jim Ozanne,P.E. Page 2 <br /> City of Everett, Washington March 24, 2006 <br /> Painting,Piping,Pumping Station Modifications, Site Work,Accessories <br /> Other Projects for the City of Everett included: <br /> Sanitary, Safety, and Shutdown (SSS)Improvements for Eight Water Storage Tanks <br /> Computerized Rating and Maintenance Prioritization for Tanks within the System <br /> 375,000 Gallon Reservoirs#1,East and West Tanks <br /> • Evaluation <br /> • Cleaning and Repainting Interior and Exterior and Shutdown Improvements <br /> • Contract Administration <br /> • Resident Project Representation during Repairs and Repainting <br /> • First Anniversary Evaluations <br /> 4,000,000 Gallon Casino Standpipe <br /> • Evaluation <br /> • Seismic Analysis <br /> • Recommendation for Replacement <br /> • Site Study for Demolition <br /> • Detailed Technical Specifications(Following Erection of Two New Tanks) <br /> • Project Representation during Demolition <br /> 130,000 Bridal Park Standpipe <br /> • Evaluation <br /> • Seismic Analysis <br /> 10,000,000 Gallon Prestressed Concrete Reservoir #6 North and South Tanks <br /> • Evaluation <br /> • Seismic Analysis <br /> 100,000 Gallon Eastmont Elevated Tank <br /> • Evaluation <br /> • Seismic Analysis <br /> • SSS Detailed Technical Specifications <br /> • Repair and Repainting Specifications <br /> • Contract Administration <br /> • Resident Project Representation <br /> 1,000,000 Gallon Upper Ridge Reservoir <br /> • Evaluation <br /> • Seismic Analysis <br /> • SSS Detailed Technical Specifications <br /> • Repair and Repainting Specifications <br /> 17 <br />