Laserfiche WebLink
SUPPLEMENTAL AGREEMENT NO. 3 <br /> To <br /> PROFESSIONAL SERVICES AGREEMENT <br /> This agreement entered into this day of , 2006, by and between the City of <br /> Everett, a municipal corporation under the laws of the State of Washington (City) and MWH <br /> Americas, Inc. (Contractor). <br /> Witneseth: <br /> Whereas the City and Contractor entered into an agreement April 8th, 2003, entitled "Professional <br /> Services Agreement" (Agreement) between the City of Everett and MWH Americas, Inc. to <br /> provide engineering services for Replacement of Water Transmission Lines 2 & 3— Phase 6, and <br /> amended the agreement by Supplemental Agreement No 1 to provide engineering services for <br /> Replacement of Water Transmission Lines 2&3 - Phase 7, and amended the agreement by <br /> Supplemental Agreement No 2 to provide engineering services for alternative design concepts <br /> study and development of the transmission line replacement project. <br /> Whereas the City and Contractor desire to supplement the Agreement for the purpose of <br /> providing additional engineering services for design of Phase 6 utilizing both pile-supported <br /> elevated pipeline and HDD construction methodologies including the following major categories <br /> of work tasks: Project Management, Meetings and QA/QC; Preliminary Design and Project <br /> Permitting; Final Design and Bidding Assistance; and Undefined Services. <br /> Now therefore, the City and Contractor do mutually agree as follows: <br /> All provisions in the Agreement shall remain in effect except as expressly modified by this <br /> supplement. The changes to the Agreement are described as follows: <br /> Amend the previous Exhibit A, Scope of Work, by adding: "Exhibit A-3 Scope of Work, <br /> Engineering Services for Replacement of Water Transmission Lines 2 and 3 - Phase 6 <br /> HDD Project". <br /> Amend the previous Exhibit B, Compensation, by adding "Exhibit B-3" which includes the <br /> updated 2006 Rate Schedule and an estimated Project Cost Summary by task for the <br /> additional engineering services. <br /> Add new Exhibit C, Project Schedule which includes the project duration for the three major <br /> work task categories identified above. <br /> Modify Paragraph 3. Time of Beginning and Completion of Performance, by deleting the <br /> existing sentence and replacing with the following sentence: <br /> "This Agreement shall commence as of the date of execution of this Agreement and <br /> shall be completed by December 31, 2008." This amounts to an extension of nineteen <br /> months. <br /> 3 <br /> I oft <br />