My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006/05/17 Council Agenda Packet
>
Council Agenda Packets
>
2006
>
2006/05/17 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2017 11:45:34 AM
Creation date
2/24/2017 11:44:35 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
5/17/2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7 EXHIBIT A-3 <br /> SCOPE OF WORK <br /> amount described above would be considered additional work, requiring prior authorization <br /> by the City. <br /> Table 1 <br /> Permit/Approval/Notification Agency <br /> 1. Section 404 of the Clean Water Act U.S. Army Corps of Engineers <br /> 2. Hydraulic Project Approval (HPA) Washington Dept. of Fisheries <br /> 3. Section 401 Water Quality Certification and Washington Dept. of Ecology <br /> CZM Consistency Review <br /> 4. NPDES Permit Washington Dept. of Ecology <br /> 5. Highway Right-of-Way Use (SR2) Washington Dept. of Transportation <br /> 6. DNR Aquatic Lands Lease Washington Dept. of Natural Resources <br /> 7. Snohomish County Shoreline Management Snohomish County <br /> Substantial Development Permit (with Targeted <br /> Drainage Plan) <br /> 8. Snohomish County Flood Hazard Permit Snohomish County <br /> 9. Snohomish County Grading Permit Snohomish County <br /> 10. Local Utility Companies Snohomish County and others <br /> 11. SEPA Checklist(See Task 10) City/Snohomish County <br /> 12. DOH Plan Review Washington Dept. of Health <br /> Task 10. SEPA Compliance <br /> A. The City will prepare the SEPA amendment and conduct all Lead Agency Coordination. It <br /> is assumed that no assistance or support is required from the Engineer. <br /> B. A copy of the SEPA amendment will be provided to the Engineer. The Engineer will <br /> review this document so that commitments presented in it can be incorporated into the <br /> project design. <br /> J <br /> MWH Page 11 EVERETT PHASE 6 HDD PROJECT <br /> 5/1/06 EXHIBIT A-3—SCOPE OF WORK <br />
The URL can be used to link to this page
Your browser does not support the video tag.