Laserfiche WebLink
7 EXHIBIT A-3 . <br /> SCOPE OF WORK <br /> • Miscellaneous piping and civil details <br /> • Structural pile bent and walkway details <br /> • Pipeline No. 4 walkway <br /> • Temporary construction access and staging areas <br /> • Demolition plan and details <br /> The following drawings are expected to be included in the Contract Drawings: <br /> Drawing No. Description <br /> General <br /> G-1 Cover Sheet <br /> G-2 Vicinity Map and Sheet Index <br /> G-3 Legend, Symbols and Abbreviations <br /> G-4 Sheet Location Map and Survey Control <br /> G-5 Hydraulic Gradeline and General Notes <br /> General Civil <br /> GC-1 Construction Access —West Section <br /> GC-2 Construction Access—East Section <br /> GC-3 Civil Details - I <br /> GC-4 Civil Details - II <br /> GC-5 Civil Details - III <br /> GC-6 Civil Details—IV <br /> GC-7 Temporary Trestle <br /> GC-8 Demolition Plan and Details <br /> Civil <br /> C-1 Transmission Line No. 2 Plan and Profile-1 <br /> C-2 Transmission Line No. 2 Plan and Profile-2 <br /> C-3 Transmission Line No. 2 Plan and Profile-3 <br /> C-4 Transmission Line No. 2 Plan and Profile-4 <br /> C-5 Transmission Line No. 2 Plan and Profile-5 <br /> C-6 Transmission Line No. 2 Plan and Profile-6 <br /> C-7 Transmission Line No. 2 Plan and Profile-7 <br /> C-8 Transmission Line No. 3 Plan and Profile-1 <br /> C-9 Transmission Line No. 3 Plan and Profile-2 <br /> C-10 Transmission Line No. 3 Plan and Profile-3 <br /> C-11 Transmission Line No. 3 Plan and Profile-4 <br /> C-12 Transmission Line No. 3 Plan and Profile-5 <br /> C-13 Transmission Line No. 3 Plan and Profile -6 <br /> C-14 Transmission Line No. 3 Plan and Profile -7 <br /> C-15 Restoration Plan-1 <br /> MWH 55 Page 15 EVERETT PHASE 6 HDD PROJECT <br /> 5/1/06 EXHIBIT A-3—SCOPE OF WORK <br />