My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006/05/17 Council Agenda Packet
>
Council Agenda Packets
>
2006
>
2006/05/17 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2017 11:45:34 AM
Creation date
2/24/2017 11:44:35 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
5/17/2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' EXHIBIT A-3 7 <br /> SCOPE OF WORK <br /> C-16 Restoration Plan-2 <br /> C-17 Restoration Plan-3 <br /> C-18 Restoration Plan-4 <br /> C-19 Planting Restoration Details <br /> C-20 Planting Restoration Schematics <br /> C-21 Planting Restoration Notes <br /> C-22 Stockpile/Staging Areas—West Section <br /> C-23 Stockpile/Staging Areas—East Section <br /> C-24 Dewater Discharge Area—West Section <br /> C-25 Dewater Discharge Area—East Section <br /> Cathodic Protection <br /> CC-1 Cathodic Protection System Details <br /> Temporary Erosion/Sedimentation Control <br /> ES-1 Temporary Erosion/Sedimentation Control Plan—I <br /> ES-2 Temporary Erosion/Sedimentation Control Plan—II <br /> ES-3 Temporary Erosion/Sedimentation Control Plan—II <br /> ES-4 Temporary Erosion/Sedimentation Control Plan Notes <br /> ES-5 Temporary Erosion/Sedimentation Control Plan Details <br /> General Structural <br /> GS-1 Structural Standard Details <br /> Structural <br /> S-1 Pile Bent Sections <br /> S-2 Pile Bent Schedule and Details <br /> S-3 Pile Sections and Details - I <br /> S-4 Pile Sections and Details - II <br /> Prepare the Plans using the previous Phase 6 (2005) project drawings as a starting point. <br /> Plans will be prepared in 22" x 34" format for reduction to 11" x 17" document format for <br /> use during design reviews and bidding. Drawings will be prepared in AutoCAD 2000 and <br /> meet City CAD standards currently in effect at the beginning of this contract. <br /> C. Final Specifications. Prepare the final specifications, bidding and contract documents, all <br /> referred to as Contract Documents,required for the work using the previous Phase 6 (2005) <br /> Project bid documents as a starting draft. The Contract Documents will be prepared using <br /> the City's most current front end documents and general conditions and Engineer's <br /> Technical Specifications based in CSI format. Specifications shall include pre- <br /> qualification of HDD contractors, HDD, contact grouting, earthwork, geotechnical <br /> monitoring, steel piping, corrosion protection, structural and other associated specification <br /> r6 <br /> MWH Page 16 EVERETT PHASE 6 HDD PROJECT <br /> 5/1/06 EXHIBIT A-3—SCOPE OF WORK <br />
The URL can be used to link to this page
Your browser does not support the video tag.