Laserfiche WebLink
� � � . . . <br /> ro <br /> i0 CC <br /> C M <br /> � y z Proj�a:l �1eeling h1inutes <br /> � � n Madison Glementary Schwl N90001�ID:i <br /> o c o luly 24, I990 <br /> b y M P:igc 3 <br /> � z �p � the wa�� to the under side of lhe sWcture on at leust one side of lhe comdor walis. It is not clear at ihis <br /> r�i tnq � time whether this plaster aclually extends on both sides of the comdor walls or only on one side. It was <br /> H � $ agreed thnt this would not matter provid d lhe ceiling were covered as describul above, and a continuous <br /> � y �y membrane ixtwcen ihe wells and ceilings is mnintained. <br /> N y <br /> Ro y D. If new insulation is put on top uf lhe ezisting roof deck so thxt the altic space is kept warm, this <br /> q insuletion would not need any seperation from the sprinkleral attic space other than what is proviJal by <br /> � ro the exisling roo(deck. A sheet of noncombuslible material, such as gypboazd, under this insulation will <br /> � y not be requiral. <br /> E. Any attic sp¢ce which is over 6" in height does require sprinklers. <br /> 8. LUNCH R00�1 CEILING <br /> A, The esisting lunch room ceiling is �omposed of a combustible ceiling tile which is 18'-2" off the floor. <br /> It was agreed thnt this nonton(orming condilion would bc allowed to remnin given Ihat this area is <br /> sprinAlered. <br /> 9. SPRINKLERING AT ANNEX <br /> p. At the annex building the low slope nf the roof nnd thc exisling glue �nm lx;ams pose a chulienge for <br /> ! �-'. sprinklering this building. The firo marshall indicated Ihet any sprinklers pinced next to a beam which is <br /> ��= greater thun 12" deep musl have a head that sprinkles up as well es down. Alteroatively, �����xi«����s <br /> could bz movecl away from beams and tied to the ceiling so that their sprny pattem would not L. . <br /> 1 inlerrupled by deeper beams. '� <br /> ��� <br /> _� B, Placemenl of sidewall heads lo cover the room was also discussed. The fim marshnll was not fami �ar <br /> with a sidewall head thal had a 15 throw, which would be ru�uired m cover lhe room. NAC will <br /> � investigate this with a sprinkler designer lo determine whnt solutions are available. <br /> i <br /> ` �=� ]0. UNDERGROUND STORAGE TANK <br /> I <br /> A. Sam Preslon indicakd lhul fuel tanks over 10,000 gnllons must go through lhe SEPA process for removul <br /> or moJification. It is unlikely that the lank at this school is ihis large und thus SGPA up ma}' not tk; e <br /> �='�' fxclor. NAC will determine lhe size ot the tank so that it can Ix:addul to tho SHPA check list i(lhis is <br /> rcquirul. Smallzr tnnks may lx:able to remlin in pince if lhey ere filled. NAC will usk ECI to make a <br /> delerminalion on how lhe existine lnnk must be treated. <br /> � � '_' Please advise writer of any addilions,delelions or corteclions lo lhe above. <br /> 1�lecting Minutes pmvidul by Greg Slack. <br /> I <br /> �_,�' hmlmm072490a <br /> . cc: Thoa;Present <br /> Mike Gunn, Everett School DisL <br /> Rick Willon, E.C.I. <br />