My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3105 PINE ST 2018-01-01 MF Import
>
Address Records
>
PINE ST
>
3105
>
3105 PINE ST 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/20/2018 11:53:50 AM
Creation date
2/24/2017 3:18:04 PM
Metadata
Fields
Template:
Address Document
Street Name
PINE ST
Street Number
3105
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
445
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� � � � � � o ��, � � <br /> '� Bob Landles, Planning Department <br /> °"eN' public Wo artmen� ��� �j Ir�� <br /> ' ��'���'j"i�.�� CITY OF L-'VEItETT - �' <br /> ��,t 8-i�-so - . <br /> �'c::u��. ,. <br /> GTY OF EVCfICiI.ClLnE1 i.WASInNGT�H � <br /> '�'•°c' S.E.P.A. Checklist Review 1/80-65 <br /> I <br /> PROPOSAL: <br /> The construction of a 262-room hotel and convention center including a <br /> restaurant and lounge at the Southeast corner of Pacific and Pine. <br /> RECOMMENDATIONS: <br /> It is the recommendation of the Public Works Department that issuance <br /> of a Negative Declaration be subject to the following: <br /> 1. A detailed drawing shall be submitted to the Public Norks Department <br /> showing parking layout, landscaping, driveways, utilitics, storm drainage, <br /> and all required improvements to the public right-of-way. Public Works <br /> Department approval of these drawings is required before any permits <br /> are issued. All improvements shall be completed before the Occupancy <br /> Permit is issued. <br /> As-builts, easement, and a one year Warranty Bond in the amount <br /> of 10% of tlie cost of construction of the public water system are <br /> required within 10 working days of obtaining public water connection. <br /> 2. City streets are to be kept clear of dirt and debris during construction. <br /> 3. During construction, all truck traffic to and from the site within the <br /> City of Everett shall be on arterial streets unless otherwise approved <br /> by the Public Works Department. <br /> 4. Participation in the North end sewer capital improvement benefit <br /> area is required. <br /> S. On-site detention is not required. A temporary erosion and sedimentation <br /> control plan must be approved by the Public Norks Department before <br /> any clearing, grading or other site preparation can begin. Drainage <br /> calculations to be submitted on City Drainage Plan submission form. <br /> Reseeding of exposed earth is required within 30 days of completion <br /> of earth �vork. Drainage systems �vill have to be developed to transfer <br /> , storm water to existing systcros by approved methods. <br /> 6. A preconstruction conference on Civil Engineering portion of project <br /> is required prior to approval of Public \Vorks Permit. The applicant <br /> shall arrange meetinginvolving applicant, job superintendent, contractor, <br /> all subcontrectors, Pire \larshall, Planning Department Coordinator, <br /> Duilding Department Coordinator, Public Works Coordinator, Public <br /> Norkslnspector, and City Traffic Enginecr. <br /> QiRISN <br /> ,_ <br />
The URL can be used to link to this page
Your browser does not support the video tag.