Laserfiche WebLink
�• ' FINAI. DECLARATION OF NON-SIGNIFICANCE . A80�15 ' <br /> � , .. <br /> ' 8; � 1� fire hydrant is required within 200 feet but not closer than 50 feet of <br /> all buildinqs. • . <br /> 9, Landscapinq must be provided in conformance with the zoning code. A minimum <br /> of Ss of the parking area shall be provided with landscapinq; a 5 ft. wide <br /> landscaped screen must be provided along all street frontaqes, and where <br /> • the sitc abuts a residential use. <br /> pRpPONENR, LOCATION OE� PROPOSAL <br /> MDE Partnership , ' � S.W. Corner at intersection of <br /> 3809 Broadway - , Pacific and Pine Streets <br /> Everett, WA 98201 • <br /> Lead Agencye City of Everett Planning Department � <br /> Contact Person: Bob Landles' Phone: 259-8731 <br /> This proposal has been determined not to have a sifnificant adverse impact on the environment: <br /> An Environmental Impact Statemecit is not required under RCW 43.21C.030(2) (c) . This decision <br /> vas made after review by the lead agency of a completed environmental checklist and other <br /> information on file with'the lead agency. This Declaration of N� n-Significance is specifically <br /> conditioned on compliance with the conditions attached hereto which are incorporated by referencc <br /> as if fully set forth herein. <br /> A fifteen day review period has elapsed for this project and no adverse comments were received. <br /> Responsible Official: Dennis Derickson � <br /> Title: Planning Director <br /> Date: March 26, 1990 File #80-15 <br /> rn �� Receipt #47242 ' <br /> Signature:�-^—•= \'� � ���� <br /> NOTE: This final Declaration of Non-Significance may be withdrawn in the event of significant <br /> changes in this proposal, or failure to comply with the conditions upon which this Declaration <br /> of Non-Significance is predicated. • <br />