Laserfiche WebLink
� <br />CRYSTALITE <br />EVERETT WA <br />425-259-6000 <br />Apri116,1998 <br />City of Everett Pnblic Works <br />Mr. Tony Lce <br />3200 Cedar Stred <br />Everett, WA 98201 <br />Re: Crystalite Warehouse Plan Check#: B-61717 <br />Dear Mr. l.ee <br />c <br />The following is the response to your commeMs on our building permit application. We have <br />provided all the information requested in your letter dated March 24, 1999. Listed below is a <br />detailed listing of the informacion and or where it can be found on our revised drawings. Two <br />sets of revised prints have been enclosed for your review. <br />We would appreciate your help in getting the building permit expedited as we have alreadY been <br />issued the site work permit and are underway with that portion of the work. Our goal is to gd <br />the project built during the favarable upcoming spring and summer weather. <br />Please note that the sprinkler system and fire alarm system will be deferred submittals. Plans <br />and specifications will be drawn by the respective �bcomraccors and submitted for pamitting <br />separate from the building permic. <br />please comact me with any questions you may have so I can be sure and do �ny part to keep the <br />process going smoothly. <br />Outlined per your letter's format: <br />Genenl <br />See the cover sheet attached W the drawings <br />2. Sec the revised parking lot configuration plan sheet 1 <br />2. a See the one-hour fire wall detail attached to page one of CBC steel building drawings for <br />the North wall. <br />2. b N/A <br />Exit signs shown on sheet 1 by CBC will be tird into fire alarm system and electrical <br />