Laserfiche WebLink
C <br />� <br />Occupancy <br />1. Areas for combustible stock, smoke venting, curtain boards, are requested to be a <br />deferred submittal as we do not know their layout and location at this time. <br />2. N/A <br />Coeatruction <br />1. Details for the storefront glazing system are provided on sheets 1-4 by Goldfinch <br />2. Safety glazing is called out on page 3 of storefront drawings as above <br />3. T)etails for entry canopy attached as drawn by Crystalite <br />4. Exposed plastic vapor bartier flamed spread classification specified on sheet 1 by CBC <br />Accesaibility <br />l. Perking revisions are noted on the revised landscape plan sheet 1 sce attached <br />2. Same as above <br />3. Same as above <br />4. Satne as above <br />5. Water closet flush controls will be mounted on the wide side of the water closet erea see <br />revised drawing attached to shect 1 by CBC. <br />6. Lavatory drain pipes and hot water pipes to be insulated. See revision note on sheet 1 by <br />CBC. <br />Ene�gy <br />i. See the oomponeM analysis and envelope summary attached to sheet 1 by CBC to use R- <br />19 at the roof in lieu of R-21. <br />2. NMed on the foundation plan attached. <br />3. U-Factors noted on page I of Goldfinch drawings on notes 10 and 11 <br />4. Same as above <br />5. Warehouse power allowance cotrection made and the revised worksheet is attached to <br />page 1 by CBC as provided by United Electric coMractors who will obtain the permits for <br />the electrical and 6re alerm work. <br />Thank you for your assistance in expediting this information. <br />Sincerely, <br />Duane Resch, Crystalite Development <br />