My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1401 POPLAR ST 2016-01-01 MF Import
>
Address Records
>
POPLAR ST
>
1401
>
1401 POPLAR ST 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2017 7:54:59 AM
Creation date
2/24/2017 4:11:41 PM
Metadata
Fields
Template:
Address Document
Street Name
POPLAR ST
Street Number
1401
Notes
SEE ALSO 2720 7TH ST
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
351
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARCHITECT�S MEETING MEMO The Dyksman 7lrahit�ots p,g, <br />PRE-BID CONFERENCE AND WALK-THRU <br />PROJECT: Phase Two-Miscellaneous Renovation <br />Work Baker Heights Housinq Units <br />Everett Housing Authority <br />ARCHITECT'S PROJECT N[JMgER: 88-402 <br />DATE: 1-15-92 <br />2:00 PM <br />PAGE: 1 OF 3 PAGES <br />1. This is Phase Two of a Four Phase Project involvinq 250 total units. <br />Units are included in 25 distinct buildinqs throughout the site. All <br />114 units are to receive exterior work and 72 are to have interior <br />renovation work. <br />2. This is a HUD funded project and HUD prevailing wage scale shall <br />qovern. This is included in the specifications. <br />3. Weekly pay slips will be required by E.H.A. <br />4. If pay requests are turned into Housinq Authority by the 20th of the <br />month, payment should be received by lOth of following month. <br />5. Lead based paint and asbestos abatement is taking place under a <br />separate contract. <br />Lead based paint will still be on exterior of buildings. No sawing, <br />grinding or sanding is to occur. Normal precautions should be <br />observed. <br />6. Security in the area is a concern. Contractor should be aware of <br />this and keep all tools, materials, offices, trailers etc. secured <br />when not occupied or in use. <br />7. Parking is in short supply, especially before 8:0o AM and after 5:00 <br />PM. Contractor to make allowances. <br />8. Due to the need to turn water mains off periodically to facilitate <br />work, 25 existing main water shut off valves need to be located and <br />made functional. The Housing Authority has a site plan indicating <br />locations off all values. <br />9. Power will remain in E.H.A. name for billing purpose. Prior to <br />building being turned over to Contractor, meter will be read, and <br />Contractor billed for power usage. <br />lo. Gas meters are in place. Start-up to be in contractor name. <br />Page 5 <br />GIIA-13aker 88-402D <br />
The URL can be used to link to this page
Your browser does not support the video tag.