My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1401 POPLAR ST 2016-01-01 MF Import
>
Address Records
>
POPLAR ST
>
1401
>
1401 POPLAR ST 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2017 7:54:59 AM
Creation date
2/24/2017 4:11:41 PM
Metadata
Fields
Template:
Address Document
Street Name
POPLAR ST
Street Number
1401
Notes
SEE ALSO 2720 7TH ST
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
351
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
'�'L'�`�'�{. <br />of TACOMA, Inc . . . . . . . . . . . . . . . . . . . . <br />Page 2 <br />April 9, 1969 <br />City of Everett <br />Attention: hlr. t3utch llorety <br />Ne: Everett Elderly Housing <br />FU 3•130� <br />. . IndustTial m�d Cowmcrcial Cmitructurs <br />2332 50. �EFFERSON AV[. <br />P. O. BOX 1093 • TACOMA. �M1'ASH. 9040i <br />e. The construction of the heaters emp.loys <br />a louvered-combination-grilled trim plai:e, <br />o-�hich is installed flush at the ceiling. <br />This serves as a finish plate and heat <br />baffle, as well as a pratective cover to <br />isolate the element and fan parts from <br />coming in contact with anyone. The <br />lauvers and grille holes are very small, <br />which should prevent anyone from trying to <br />poke an object into the heater proper. <br />f. These heaters are not a normally stocked <br />item and were manufactured especially for <br />this project. 4Je �aould have little or no <br />salvage value for thern as a consequence. <br />Fresently we have about (15) heaters in- <br />stalled and would delay construction for all <br />other trades at least (60) days �ahile another <br />manufactured unit was procurred. Not only <br />would changing the heaters be costly to us, <br />it would cost the General Contractor several <br />thousand dollars in tardy complei:ion fines, <br />not to mention the inconvenience this would <br />6e to one hundred fifty Senior L'itizens, <br />uho are planninn to move int❑ the compleied <br />complex s�ortly. <br />;le respectfully request that because the application <br />of the heaters in question is noi: normal, special consid- <br />eration be given, and we be authorized to proceed as <br />quickly as possible. <br />Thank you for your help in this matter. <br />Very truly yours, <br />TUTEM ELECTRIC OF <br />,, <br />• �j <br />ll y : � ��. i � � <br />CLH:cj <br />cc: Clerk uf the iiorks <br />Howard Johnson :. Associates <br />Newland Construction <br />TACUMA, <br />.. <br />('�/,.!r',� <br />INC. <br />,' <br />
The URL can be used to link to this page
Your browser does not support the video tag.