Laserfiche WebLink
r �• <br />Provide a response letter showing where each item in this correction letter is <br />addressed on the plan set. <br />Upon resub',Mtal of the drawings, your application will be given priority and plan <br />review will commence. <br />All required submittals shall be of sufficient detail and contain sufficient information <br />to ensure that the proposed structure will be constructed in compliance with all <br />adopted codes. <br />Sincerely,, <br />N.42� <br />e eilman <br />llev.elopment Technician <br />JH jvc"10-013 <br />