My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1130 RAINIER AVE WHOLE SITE DOCUMENTS 2016-01-01 MF Import
>
Address Records
>
RAINIER AVE
>
1130
>
WHOLE SITE DOCUMENTS
>
1130 RAINIER AVE WHOLE SITE DOCUMENTS 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2017 8:09:08 AM
Creation date
2/24/2017 4:37:47 PM
Metadata
Fields
Template:
Address Document
Street Name
RAINIER AVE
Street Number
1130
Tenant Name
WHOLE SITE DOCUMENTS
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� <br />� <br />GEOTEC�-I <br />CONSULTANTS, INC_ <br />Everett Housing Authority <br />°O Eox 1547 <br />Everett, �Nashington 9820G-1547 <br />Attention: Bud Alkire <br />� <br />�i 3v z-U ( �� <br />� ,� � y- �, �- <br />S�,hjecL Transmittal Letter— Geotechnical Engineering Study <br />Proocsed Pivotal Point Apartrnents <br />1110 Rainier Avenue <br />Everett, Washington <br />Dear 1�1r. Alkire: <br />13256 Nonhcnci 20th Strcct, Suitc 16 <br />Ocllevue, W;uhington 98005 <br />(425)747�56iR FA\ (425)74)-RS61 <br />May 16, 2012 <br />JtJ 12080 <br />via email <br />��Ve are pteased to present thls geotechnicai engineer,ng report for the proaosed Pivotal Point <br />Apartments project to be constructed ir Everett, Washington. The scope of our servic=s consisted <br />of exploring site suriace and subsurface conditions, and tnen developing this report to provide <br />recommendations for general earth�vork and design criteria for foundations and retaining walls. <br />This �vork was authorized by your acceotance of our proposal, P-8245, dat=d October 15, 2011. <br />The attached report contains a discussion of the study and our recommendations. Please contact <br />us iE there ara any questions regarding this repor, or for further assistance during the design ard <br />construction phases of lhis projact. <br />Respecliully submitted, <br />cc Common Ground — Kym Halcy <br />via ernail to: KymH@commonground�va.org <br />DR�N: j�b <br />GEOTFCN CONSUL7qNi5,IMC <br />INC. <br />
The URL can be used to link to this page
Your browser does not support the video tag.