My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1130 RAINIER AVE WHOLE SITE DOCUMENTS 2016-01-01 MF Import
>
Address Records
>
RAINIER AVE
>
1130
>
WHOLE SITE DOCUMENTS
>
1130 RAINIER AVE WHOLE SITE DOCUMENTS 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2017 8:09:08 AM
Creation date
2/24/2017 4:37:47 PM
Metadata
Fields
Template:
Address Document
Street Name
RAINIER AVE
Street Number
1130
Tenant Name
WHOLE SITE DOCUMENTS
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GEOTECHNICAL ENGINEERING STUDY <br />Pivotal Point Apartments <br />1110 Rainier Avenue <br />Everett. Washington <br />This report presents fne findinas and recomn-enda6ons o( our geotechnico� engineenny ;;c�y �or <br />iI1P. SI�E,' Of i�lE' �fOpCS2G 'c(J3f(Il1F.111 GBV•�IO,GfilB.l1 l0 U� IOC3IBG Ill C\'8f�i�, �1'JlSIL^!7t0i1. <br />Pr�or to doing explorations, we svere provided tivith an approximzte layout of proposed buildinc,s and <br />a topographic survey o( the property. Fol!owing expiorations, we v��ere provided e•rilh an updated <br />alan of the development; lhis was prepared by ARC Architects. Tne plan indiczted that a buildinr, <br />i; proposed on lhe soulhwestem corner of ihe dev�lopment slle and on the eastem s�de of lhe sile. <br />The �vestern porlion of the soulh�vestern building will have a finish (loor grade oF elevation 98 teet, <br />:vhile the eastern portion will be at elevation 94 feet. The eastem building will also have finish floor <br />grade of elevation 94 feet. These tinish Ooor grades �vill generally be near or just above the <br />existing ground level. <br />If lhe scope of the project changes from what we have described above. �ve should be provided <br />�.vith revised plans in order to determine if modificatio�s to lhe rocommer.dalions and corclusions o! <br />this report are warranted. <br />SITE CONDITIONS <br />SURFACE <br />The Vicinity Niap, Plcte 1, illustrates the general location of the site in the northem portion of <br />Everett. The site that will be developed is on the southem side of an existing Army Reserve <br />Facility, located at the corner o( Rainier Avenue and 11th Street. 7his development area is <br />currently mostly covered with hvo parking lots. Both !ots slope slighUy do�vnward to ihe wesL The <br />eastem lot is siluated about 4 feet beloev the �.vestern lot. A sleep slope separates lhe two parking <br />lots. <br />The properly lo the evesl of the site is approximatety 10 feet above the weslam parking lol; a sleep <br />slope separates the site from ihe adjacent �vestern property. The area east of 1he sile siopes <br />gentiy av�ay irom it. <br />SUBSURFACE <br />The subsurface conditlons were explored by drilling six test bonrgs at Ihe approximale locafions <br />shotivn on the Site Exploration Plan, Piate 2. Our exploralion program �vas based on iha proposed <br />construction, anlicipated subsurface conditions and those encountered during exploration, and the <br />scope �f �vork outlined in our proposal. <br />The tesl borings were drilled on May 3, 2012 using a lraiter•mounted, hollor:-stem auger dnll. <br />Samples were taken at 2.5 to 5-foot intervals wilh a sl2ndard penetration samplec This split-spoon <br />sampler, evhich has a 2-inch oulside diameter, is dri�ien into the soil wilh a 140-pound hamrner <br />falling 30 inches. The number of blo�vs required lo �dvance ihe sampler a given dislance is an <br />indication o( the soil deosity or consrtency. A geotechnical ergineer from our sta(f observed tha <br />G=OTECH CONSULTANIS. R1C. <br />
The URL can be used to link to this page
Your browser does not support the video tag.