Laserfiche WebLink
Summary <br />1915 RAINIER AVE <br />Permit: C0710-001 <br />Permit: E0712-027 <br />City of Everett Public Services <br />Permits and Inspection Records as of 1/21/2011 <br />1915 Rainier Ave <br />Status: FINALED <br />Status: FINALED <br />Permit: PW0710.017 SWtus: FINALED <br />Permit: U1008•016 Status: FINALED <br />TWO STORY ADDITION <br />WIRING/ELECTRICAL FOR NEW TWO STORY ADD <br />TWO STORY ADDITION <br />SIDE SEWER REPAIR <br />InspectlonTv�e Date Result Remarks <br />1915 RAINIER AVE <br />Permit: C0710-001 Status: FINALED Issued: 11/30/07 Finaled:3/19l10 To Records: <br />Description: TWO STORY ADDITION <br />Notes/Conditions: <br />UFER Ground 12/6/07 PartialApproval See Foundation 12I06/2007 notes <br />Footing <br />12/6/07 PartialApproval See Foundation 12I06/2007 notes <br />Foundation 12/6/07 PartialApproval See notes <br />note: <br />Does not include footing for point load at stairs <br />1. Remove water <br />2. Add UFER bar <br />Framing 1/2/08 Approval Underfloor <br />PlbgRoughln 4/1/08 Corr Reqd See notes <br />Corrections: <br />1. Vent for tub must be downstream of trap arm and begin above the center line of the waste pipe <br />2. Left affidavit for pressure test <br />3. Recall inspection when lub is fixed <br />MechRoughin 4/1/08 Corr Reqd See notes <br />Corrections: <br />1. Complete exhaust fans <br />2. Complete 8-vent chase <br />3. Vent connector cannot penetrate the ceiling (corrugated) <br />PlbgRoughln 4/3/08 Approval Ok-correctionscomplete <br />GasPiping <br />4/3/08 Approval Gas at 18 psi- ok for service <br />MechRoughln 4r11/08 PartialApproval See notes <br />OK B-vent in laundry r�om only. <br />Please complete all other corrections before calling next inspections. <br />ShearNailing 4/11/OB Corr Reyd See notes <br />9:30 a.m. no one on site. <br />Approved plans and permit not on site. <br />Note: Complete nailing upper south side. <br />S:\M Mcleod\Crystal\Inspection Records.rpt 1 /24/2011 <br />\�/ V <br />