Laserfiche WebLink
• 2412 Oake� • � � I I <br /> Relocate existing lav/vanity base in downstairs bath as <br /> shown. Relocate medicine cabinet and wall light fixture <br /> over vanfty base/lav. <br /> Install new 50 gallon gas fired hot water• tank, quick <br /> recovery type, as shown in kitchen. ° Provide all <br /> necessary plumbing. A.O. Smith or equal. install <br /> automatic timer for hot water tank, located in corner by <br /> tank. <br /> Install plumbing waste and venting for clothes washer <br /> and dishwasher in kitchen. <br /> s � 9'So — <br /> 15. Electrical All new electrical work : in accordance <br /> wit�h the National Electrical Code, 1981 edition. <br /> Replace all existing two-pole wiring with new three-pole <br /> wiring in house complete. All new wiring : concealed in <br /> wall. Contractor , responsible for patching ready to <br /> paint. <br /> Install new recessed electric heaters with squirrel cage <br /> fans, Square 'D' or equal in all upstairs bedrooms and <br /> •� in bath. Heaters controlled with wall mounted <br /> thermostats. Size wattage to code. <br /> Install owner' s new exterior light fixture at back door, <br /> switched inside by door. <br /> Install new ceiling light fixtures in upstairs � hall <br /> switched at top of stairs and tied into existing 3-way <br /> system in stairwell and upstairs bathroom, switched in <br /> bathroom hy door, material allowance : $25 per fixtvre. <br /> Replace light fixture on kitchen ceiling, $25 material <br /> allowance, switched on wall, and:_ install switch on wall <br /> for existing light fixture in center room downstairs. <br /> Install new duplex receptacles- upstairs to repl� e all <br /> single receptacles. install GFI receptacle circ�it in <br /> upstairs bath on same circuit as downstairs bath <br /> receptacle and new exterior receptacle outside back <br /> , door. Install two additional duplex receptacles in the <br /> east bedroom, three in the south center bedroom and four <br /> in the southwest bedroom upstair�. <br /> Install new bathroom exhaust fan in..ce?lings of upstairs <br /> and downstairs bathrooms to vent out house, Nutone or • <br /> equal, $50 material allowance -per fixture, provide all <br /> ducting, wiring to wall switch anil hood. - <br /> 1 <br /> Install new range hood in kitchen above range. Material <br /> allowance : $150, Nutone or equal, owner choice of <br /> color, include ail ductinq and hood to exhaust outside <br /> house. <br /> Install wiring and outlets for new electric hot water <br /> tank, refrigerator , oven/range, dishwasher , clothes <br /> washer and clothes dryer in kitchen as shown. <br />