Laserfiche WebLink
• , • ' REPAI�ECIFICATIONS AND LIST O�ORK TO SE SID <br /> Paqe � �f � <br /> Address: 2620 Oakes <br /> 2620 Oakes <br /> 1. Roofing Tear off existing roofing complete to skip <br /> sheathing. Replace any rotted starter boards. Tear off <br /> awning over second floor entry. Install new 1/2" CDX <br /> plywood roof sheathing. Install 15A asphalt impregnated <br /> felt. Install galvanized metal drip edge on all rakes <br /> and eaves. Tear off chimney to below roof line. <br /> Install new 220# three-tab fiberglass composition <br /> shingles, 20 year guarantee, owner choice of color. <br /> install in accordance with manufacturer 's installation <br /> instructions and register date of application with <br /> , manufacturer. <br /> s / 3 � <br /> 2. Gutters Tear off existing gutters and downspouts <br /> complete. Install new continuous 5" aluminum 'R' style <br /> gutters and matching downspouts, owner choice of color. <br /> Secure gutters 48" O.C. into rafter tails. Slope <br /> gutters to drain .to downspouts and seal all joints with <br /> approved sealant. Secure downspouts top, bottom and at <br /> all joints. Provide precast concrete splashblocks at <br /> all downspouts. <br /> $ � I Z� <br /> 3. Foundation Excavate soil under house to at least 18" <br /> from jo s s and 12" to bottom of beam. Remove all wood <br /> at perimeter within 6" of grade. Replace missing or <br /> rotted posts and replace piers as necessary to code. <br /> Install new concrete asbestos board skirting on new <br /> pressure treated backing. Install foundation vents for <br /> under-floor insulation to code. <br /> $ � � .j� <br /> 4. Carpentry See drawings for layout of new stairs to <br /> secor.3 floor. Cut opening in floor and walls as <br /> necessary to install new stairwell as shown. Stairs : 3 <br /> - 2 X 12 stringers, tread : 10" , risers : approximately <br /> 7-1/2". install 4 x 4 headers above and below stairs as <br /> necessary. Install wall on first floor from foot of <br /> stairs, south to north wall of south bedroom, floor to <br /> ceiling. Install 36" high wall along stairwell opening <br /> on second floor . <br /> Install new partition walls on first floor as shown in <br /> drawings. All new walls : 2 x 4, 16" O.C. All new <br /> framing in this section : prepared for installation of <br /> gypsum wallboard and installed to code. <br /> Install shelf and rod in each clothes closet downstairs <br /> as shown. <br />