Laserfiche WebLink
, ' _ REPAI�ECIFIC�TIONS AND LIST OF�RI( TO BE BID <br /> Address: 2620 Oakes <br /> Paqe ✓ UT I <br /> Replace existing deck outside entry to first floor with <br /> new pressure treated materials, supported and anchored <br /> to code. <br /> Tear off existing stairs on exterior to second floor and <br /> replace all missing siding in stair area. <br /> Install new countertop on kitchen base cabinets. <br /> Underlayment : 3/4" particle board. Install laminate on <br /> counter , front edge and up wall to wall cabinets. Owner <br /> choice of color. <br /> . s v� d � D <br /> 5. Doors & Windows Remove existing door to exterior on <br /> secon loor and install new 3-0 x 2-0 raw unit window. <br /> Install necessary sill and cripple framing for new rough <br /> opening. Remove existing window on first floor adjacent <br /> to new stairwell and install new 2-8 x 2-0 awning window <br /> to top of existing rough opening. Frame bottom of <br /> opening as above. Patch siding on exterior of new <br /> windows . as necessary. Install one new egress sized <br /> casement window in each downstairs bedroom as shown in <br /> existing locations, new rough openings as necessary. <br /> Exterior trim to match existing, framing and headers to <br /> code. Windows : Milgard or equal, mill finish, with <br /> screens. <br /> Install new pre-hung pre-finished, hollow core doors on _ <br /> each bedroom and on large bedroom closet downstairs as <br /> shown. Doors : 2 ' 6" . Install new pre-finished bifold <br /> doors on northwest downstairs closet and on opening to <br /> • laundry hot watec tank area as shown. install all <br /> necessary hardware for all doors . Hinged doors : <br /> ' passage lockset, Schlage or equal. install plywood . <br /> (3/4") door to storage area under stairs in southeast <br /> bedroom as shown. Include hinge and latch hardware. <br /> $_� � / 7 <br /> 6. Walls & Ceilings Install new 1/2" gypsum wallboacd <br /> on all interior wall and ceiling surfaces downstairs, <br /> around stairwell wall upstairs, and below window where <br /> door to exterior was removed on second floor. Tape and ' <br /> spackle for textured finish except on second floor. All <br /> new surface upstairs : smooth wall finish. Apply spray <br /> texture to all new gypsum wallboard on first floor , <br /> knock down finish. <br /> $ 17 � <br /> 7. Floors Install new carpet on 3/8" rebond pad in all <br /> rooms downstairs and on stairway to second floor . <br /> Material allowance for carpet . $12 , per square yard <br /> retail. Use manufacturer ' s approved tack strips and <br /> edge bars. Owner 's choice of color and style. <br /> $ 7 a. U <br />