Laserfiche WebLink
. � , - REPAI�PECIFICATIONS AND LIST O�ORK TO BE BID <br /> . Paqe 5 D� � <br /> Address: 2618 Oakes <br /> . 2618 oakes <br /> 1. Roofina Tear off existing roofing complete to skip <br /> sheathing. Replace any rotted starter boards. install <br /> new 1/2" CDX plywood roof sheathing. Install 15# <br /> asphalt impregnated felt. Install galvanized metal drip <br /> edge on all rakes and eaves. Install new 220A three-tab <br /> fiberglass composition shingles, 20 year guarantee, <br /> owner choice of color. Install in accordance with <br /> manufacturer 's installation instructions and register <br /> date of application with manufacturer. <br /> $ ao3o <br /> ?.. Gutters Tear off existing gutters and downspouts <br /> complete. install new continuous 5" aluminum 'R' style <br /> gutters and matching downspouts, owner choice of color. <br /> Secure gutters 48" O.C. into rafter tails. Slope <br /> gutters to drain to downspouts and seal all joints with <br /> approved sealant. Secure downspouts top, bottom and at <br /> all joints. Provide precast concrete splashblocks at <br /> all downspouts. <br /> $ J � � <br /> 3. Foundation Remove existing skirting (i.e. all siding <br /> from foundation beam down to grade) around foundation. <br /> Replace any rotted posts and correct post and pier <br /> system to meet codQ. Install . new concrete asbestos <br /> board skirting on new pressure treated backing. Install <br /> foundation vents for future underfloor insulation to <br /> code. <br /> ' s /5.2.� <br /> 4. $ack Porch Tear off soffit, deck, step, and outside <br /> walls rom back porch. Replace soffit with 3/8" 303 <br /> plywood. Replace step deck and under deck support with <br /> new pressure treated materials. Tie deck into existing <br /> posts. Do not replace walls. <br /> s_ 3 `� � <br /> ' S. Bathroom Remodel Tear out tub, all plaster on walls <br /> (except east wall) , and floor to subfloor. Install new <br /> stub wall for tub/shower enclosure. InstaYl new 1/2" <br /> gypsum wallboard on all bare walls, taped and spackled <br /> for smooth wall finish. Owner will paint. <br /> Install new 1/2" C-C plugged plywood, exterior glue, <br /> over bathroom floor for underlayment. Install new vinyl <br /> over floor, material allowance . $12 per sq, yd. , <br /> owner 's choice of color and style. Use manufacturer ' s <br /> approved adhesive and edge strips. Install resilient <br /> base at perimeter of floor. ' <br /> Install new bath accessories including shower curtain <br /> rod, towel bar and toothbrush holder , Franklin Brass or <br /> equal. Install new tempered glass shower door , material <br /> allowance $200, owner choice of style. Reinstall <br /> existing toilet paper holder. Install new surface <br /> mounted medicine cabinet, material allowance . $100, <br /> owner choice of style. <br /> s IU �U <br />