Laserfiche WebLink
, � . _ REPAI�PECIFICATIONS AND LIST O�ORK TO BE BID <br /> Paqe � OT 9 <br /> Address: 2620 Oakes <br /> 8. Insulation Remove existing insulation between first <br /> and second floor and use batts to insulate floor of <br /> house over crawl space. Support insulation with fir <br /> strips 18" O.C. perpendicular to joists. <br /> Install R-11 fibergZass batts in first floor exterior <br /> wall cavities, foil or kraft backed, Staple backing <br /> along studs. <br /> $ � �� <br /> 9. Electrical All new electrical work : in accordance <br /> with the National Electrical Code, 1981 edition. ' <br /> Install new 200 amp electric service breaker panel, <br /> including mast and all necessary hookups. Correct all <br /> illegal wiring in ceiling and walls of first floor , put <br /> all splices in boxes and cover all boxes. <br /> Install new duplex receptacles in first floor bedrooms <br /> as shown in drawings Install new ceiling light fixtures <br /> on switches in each downstairs bedroom and large closet, <br /> inside entry area, (on three-way switch) , and outside <br /> entry to first floor. Material allowance per fixture : <br /> $15. Install new exhaust fan in bathroom, Nutone Model <br /> i686 or equal, operated on wall mounted switch, <br /> exhausted out roof. <br /> ' Install outlets for clothes washer and dryer and wiring ' <br /> for hot water tank as shown. Install vent for dryer to <br /> exterior. <br /> • s / 3 / `f <br /> 10. •Plumbing All new plumbing work : in accordance with <br /> the National Electrical Code, 1979 edition. <br /> Replace all existing house galvanized service plumbing <br /> pipes with new copper including risers. Relocate hot <br /> water tank to closet as shown. <br /> Reset kitchen sink after new countertop is installed. <br /> Install service, waste and vent plumbing for new clothes <br /> washer and dryer in closet next to hot water tank. <br /> —$-- / � � !7 <br />