Laserfiche WebLink
Ls�zY �•2•8z. <br />'�►a (a-2—�7 <br />'�.� _____�. <br />�D ���� "� � <br />,U�y p � 198i <br />May 29, 1987 ._ <br />Mr. Chuck Lundgren <br />PUblic Works Engineer <br />Burlington-Northern Railroed <br />2200 First Interstate Center, 22 Floor <br />999 fiird Avenue <br />Seattle, WA 98104 <br />RE: DOCKET 2205 FqWARTH PARK BRIDGE DRAWINGS <br />Dear Mr. Lundgren: <br />...... <br />��r( OF EVERE'R <br />Pub'.ic Works cePt. <br />everett <br />the Evergreen <br />everett <br />P�RaS �HO RCCRGTIOH <br />�FV�RTMEAi�-pOAESTD�qa <br />75� 0]00 <br />SC�H �zos�a��.�a�o <br />MAI� WG �O�AE55 <br />JODl WE�MGFL <br />FrENF1T M• 99]oi <br />Your pronpt review and epproval of the above project drawings is appreciated. <br />Burlington-Northem personnel ere also being helpful locelly end have already <br />placed the track planking. <br />Upon receipt of your 5/22/87 signature on the hridge drawings indiceting °No <br />Exceptions Taken" (end concurrent review arni approval by Lee .bhnson <br />Consultants and Ben Edwards, City of Everett Plens Examiner), vre have <br />autfarized JIJ Cor.struction to proceed with constr�ction. <br />We understand that our ections to date ere in conformance with 1) Docket 2205 <br />and its suppleme�tal egreement, 2) Section C: 'Special Railroad Provisions' of <br />the construction dxuments and 3) other terms governing the city's egreement <br />rith the railroad as it pertains to this project. Please advise us <br />imnediately if this is not the case. <br />It is our intention to make this a successful project for the railroad, <br />contractor and the cf.ty. Thank you. <br />Sincerely, <br />T/�,��'�� <br />Theo Mittlt, Project Coordinator <br />cc Ben Edwards, Plans Ezami�er / <br />Larry Callahan, Building Official d <br />Knut Olberg, JIJ Construction <br />Bob Garner, Lee Johnson Consultants <br />Les Martin, Burlington-Northern, Everett <br />Bob Cooper, Director, Parks Department <br />Jim Shields, Assn't. Director, Parks Department <br />0236d:br <br />