Laserfiche WebLink
TO <br />FROM: <br />DATE: <br />� <br />BEN EL'v1ARD5 <br />THEO MITTET, <br />I�1AY 29, 19A7 <br />�� <br />PARK PLANNER � � <br />� <br />SUBJECT: FIOWARTH PlIRK CONSTRUCTION DRAWINGS <br />r� <br />�r��r�odr��� <br />JUN ��1987 <br />_ ..............................................._.._ . <br />CITY OF EVERETT <br />Pub!ic Works Dept. <br />1. eased upon approval of all drawings by l_ee Johnson Consultants and "no <br />exceptions taken" by Burlington-Northern's Public Works Engingeer, you <br />have advised us of approval of plans anC structural calculations (with <br />the exception of the handrail detail for the stair tower nn sheet 9 of <br />the drawings. <br />2. Per your conversations with W. C. Brockway, Ar.chitect, and I_ee Johnson <br />Consultants, a revised connection of the chain link febric to the hand <br />rail by use of "Molly holt" has eliminated the tension bands whict� wrap <br />around the hand rail as shown on the original drawings. <br />3. We are proceeding on your verbal approval of construction drawings and <br />have instructed JIJ Construction to apply for a building permit. <br />4. We are assuming that your review and approvsl is complete and final as of <br />this date. Please advise me immediately if anything remains unresolved. <br />Thank you. <br />cc Knut Olberg, JIJ Construction <br />Bob Garner, Lee Johnson Consultants <br />Larry Callahan, Building Official <br />Attachmenc: 5/22/87 letter from Burlington Northern <br />0234d:br <br />