Laserfiche WebLink
. � <br /> � Boteseh, Nash i Hall <br /> Architects, P.S. <br /> O �j <br /> April 16, 2010 �� <br /> ��Steve Miller �'tiY � <br /> City of Everett C�Ty ��g ., <br /> 3200 Cedar Street A�iyh�F� � �p O <br /> Everett, WA. 98201 <br /> RE: Puget Sound Kidney Center /fse��es TT <br /> Administration Building <br /> Plan Check No: B1003-017 <br /> Review Comments <br /> Comment ID # 1 The cover sheet should be revised to indicate the 2006 Uniform <br /> Plumbing Code rather than the 2006 International Plumbing Gode. <br /> See Architectural Sheet G1.0 for reviaion marked with a clouded Delta 2 <br /> Comment ID # 2 The IBC does not require a one-hour fire barrier surrounding the <br /> elevator shaft or elevator equipment room. If the barriers are desirable, detailing should <br /> be included to provide continuity through the floor systems, at the lid of the equipment <br /> room, and the door. <br /> See keynote 2.25 on sheet A2.1 and keynote 5.44 on aheet A5.4. The equipment <br /> room is called out to have a GWB ceiling. On sheet A9.0, door 106A is called out <br /> to have a 60 min. fire rating. <br /> Comment ID # 3 The IBC does not require a one-hour fire barrier surrounding the <br /> stairway shaft. If they are desirable, detailing should be included to provide continuity <br /> through the floor system. <br /> A one-hour barrier will be required ahould the owner want a aecond floor to be <br /> built in the future. See detail 7/A5.5 and aections 1 and 21A5.5 for floor system <br /> continuity per meeting discussion on 4-12-10. <br /> Comment ID # 4 IBC 2903.4 (State Amendments) requires a drinking fountain. IBC <br /> 1109.5.1 requires and additional accessible drinking fountain. <br /> / <br />