My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1315 PACIFIC AVE 2018-01-01 MF Import
>
Address Records
>
PACIFIC AVE
>
1315
>
1315 PACIFIC AVE 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2018 9:27:38 AM
Creation date
2/25/2017 5:38:58 AM
Metadata
Fields
Template:
Address Document
Street Name
PACIFIC AVE
Street Number
1315
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
379
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7. Provide a structural connection bctween the existing foundation and the soldier piics,and <br /> 8. Construct the remainder of thc soldier pile wall. <br /> Slant pile undc�inning requircs carcful con:rol of caving soil candieions in order to prevent excessive <br /> settlement bclow cxisting foundations. Where caving soils arc prcsent, thc ace of drilling mud may be <br /> necessary. The bottom of the drilled shafts for soldier piles should be cleaned out prior to placing <br /> concrcte in the shaft. The shafl bottom can be cleaned ut;ng a clean-out bucket or ather means proposed <br /> by thc contrac�or and approved by GeoEngineers. Steel wedges or jacks,-nd non-shrink grout can be used <br /> at the foundation/soldier pile connection to reduce thc settlement potentia. however,altemative strucwral <br /> connections may be necessary depcnding upon the cxisting foundation configuration and anticipated <br /> loads. <br /> SHORING MONITORING <br /> Pre-CortsbueNon Survey <br /> A shoring monitnring program should be cstablishcd to monitor Ihc perfomiancc of the cut section <br /> rctaining walls and to provide eady detection oC detlections that could potentially damagc nearby <br /> improvcments. We rccommcnd ihat a prc-construction survcy of adjaccnt im�rovements, such as streets, <br /> u�ilities, and buildings, be perfortncd prior to commcncing construction. Thc pm-construction survey <br /> should include a vidco or photographic survey of the condition of cxisting improvcmcnts to establish thc <br /> prc-construction condition,with spccial attcntion to cxisting cracks in strcets or buildings. <br /> Opt7cal Survey <br /> Thc shoring monitoring program should includc an optical survcy monitoring program. The <br /> rccommcnded frequcncy of monitoring should vary as a function of�he stage of consWction as presented <br /> in thc follow�ing tablc: <br /> Conrtruatloe l/q� MonNo�MiY F�y <br /> During eccavation and until wall movements have stabilized Twice Neekly <br /> __ _._ ... .... _ . — . __�._ ------.._- _.._ <br /> During excava�ion it lateral wall movaments ezceed 1 inch and until Dally <br /> wall movements have stabilized <br /> __. _.... . __. .._. ._.._.. -- � -------------- <br /> Aner er,cavation is completelwall movements have sWbillzed and twice monthly <br /> pnor lo the floors of Ihe building reaching the top of Ihe excavatian <br /> Monitoring should include vertical nnd horizontal survey mcasurements accuratc to at Icast 0.01 fcct. <br /> A bascline reading of thc monitoring poinls should be completed prior to bcginning shoring installation. <br /> The survey data should be provided lo GeoGngineers for revicw within 24 hours. <br /> i'or shoring walls, we recommend that optical survey poin:s be established along the top of the shoring <br /> walls, at the wrb behind thc walls, and on cxisting buildings located within a horizontal distance of the <br /> shoring walls cqual to thc height of thc wall. The survcy points should bc spaced every 25 feet along thc <br /> wall face and the points along the curb lindcxisting buildings should be located immediately behind the <br /> points along the lop of thc H�aIL Additional survey points should also be installed at mid-height of the <br /> wall as thc cxcavation progresscs if latcral movcmcnts cxcced 1 inch, at thc samc spacing as thc poinu <br /> along the top of the �call. If latcral wall mo�cmcnts arc obscn•cd to bc in cxcess of '/:inch betwcen <br /> sucecssiee readings or if total wall mo��ctneNs cxceed 1 inch, construction of Ihc shoring walls should be <br /> ni,.co_rtu-onr-oo PaR�'9 GeoEwe�M[t�s� <br /> ✓�����•�.1,�d,�� <br /> 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.