My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2201 PACIFIC AVE 2016-01-01 MF Import
>
Address Records
>
PACIFIC AVE
>
2201
>
2201 PACIFIC AVE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2017 6:40:35 AM
Creation date
2/25/2017 6:40:06 AM
Metadata
Fields
Template:
Address Document
Street Name
PACIFIC AVE
Street Number
2201
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
190
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�c� <br /> O� x ' <br /> t"y y <br /> H� i�-+ <br /> hC f� <br /> H 7� <br /> "�9 M "�C <br /> V! H <br /> �Xp �c ![ITIGATION RBQUZRED BY EXISTING CODES AND ORDINANCES <br /> HC <br /> o He 1. A fire hydrant is required within 200 driving feet but not <br /> r�i �o closer than 50 feet, of every structure. (SEPA Public Services <br /> H` � and Utilities Folicies) <br /> zri�'�+ � y 2. Full standard ha1P street improvements are required to Smith <br /> g y � Street, including but not limited to, curb, gutter, sidewalk, <br /> ��y street widening to 18 feet from center line, drainr.ge control <br /> and transit:ons per City Standards on the proposal's full <br /> � frontage pe.r Ordinance 555-78 as amended. (SEPA Transportation <br /> y� y Policies) <br /> 3. Curb, gutter, and sidewalk improvements are required to McDougal <br /> _ Avenue per City Standards on the proposal's full frontage per <br /> ! �•� Ordinance 55-78 as amended. (SEPA Transportation Policies) <br /> � <br /> �.i ;`, �,. 4. The driveway on Pacific Avenue must be removed and replaced with <br /> ; � •�'�;' curb, gutter, and sidewalk per City Standards per Ordinance <br /> ",d�,,� : 555-78 as amended. (SEPA Transportation Policies) <br /> �.i w;. <br /> ; 5. SpPcial charges for connection to the sewer system in accordance <br /> �n` _, <br /> with Ordinance 984-83 are applicable. The actual cost shall be <br /> computed by the building Department per the ordinance in effect <br /> at the time and according to the :�formation provided on the <br /> approved plans on the date of permit issuance. (SEPA Public <br /> '�' Services and Utilities Policies) <br /> ��� 6. A 20 foot sewer main easement is required for the existing sewer <br /> main that crosses the site. A hold harmless agreement is <br /> � ' required for the existing sewer main. (SEPA Public Services and <br /> ' ' Utilities Policies) <br /> 7. The floor slab construction over the easement area of the sewer <br /> 1 main must be designed to facilitate any repair/replacement of <br /> ' the main. Access to the manhole is also required. <br /> � 8. On-site detention is required, oR, in lieu of providing on-site <br /> �� detention, payment to City Drainage Fund 34o is allowed per <br /> ' ' Ordinance 670-80. (SEPA Public Services and Utilities <br /> � Policies) <br /> � 9. Parking must be per City Zoning Code and City Design and <br /> ' Construction Standards. For the uses proposed (2,500 sf <br /> showroom, 19,269 sf warehouse and 3,654 sf office) , a minimum of <br /> ' 26 parking stalls are required. (SEPA Transportation Policies) <br /> f 10. Any broken/damaged sidewalk shall be repaired/replaced per tlie <br /> City Public Works inspector per Ordinance 555-78 as amended. <br /> SEPA Transportation Policies) <br /> 11. Fire flow requirements for this building is 2,870 gpm (ISO) . <br /> Fire flow must be provided per this requirement. (SEPA Public <br /> Services and Utilities Policies) <br /> 12. A landscape strip a minimum of 5 feet wide must be provided <br />
The URL can be used to link to this page
Your browser does not support the video tag.