My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2903 PACIFIC AVE 2016-01-01 MF Import
>
Address Records
>
PACIFIC AVE
>
2903
>
2903 PACIFIC AVE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2017 7:28:21 AM
Creation date
2/25/2017 7:27:46 AM
Metadata
Fields
Template:
Address Document
Street Name
PACIFIC AVE
Street Number
2903
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
238
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
, - <br /> �� niarvin C. Haglund, IIirector of Utiliti 's ' D � f� ^ r�+ <br /> � ', + . . <br /> `"'�`S'�\Roy VanDerA7eersche. Water 5upt. ��aig Thompson, Sewe�S�pt.�.` '� � -� . , <br /> t' �w ��D, ��. - <br /> �,*E November 29, 1977 f� DEC G 1977 - �� ' <br /> . ; ;' : <br /> SUBJCCT DENNY'S R�STAURANT CITY OF EVERETT. EVERET�W..SNINVitiry EVE�'��_,i� a� <br /> Planning De�t� <br /> \VATER: <br /> The utility dra�ving shows the t�vo inch (2") �vater service to be connected to the G" <br /> cast iron water main located on the east side of Pine Street. Wat:er pressure in <br /> the area is approximately 98 psi. <br /> The sanitary sewer and storm drainage construction on Pacific Avenue will necessi- <br /> tate crossing the 48" tivater transmission line., The Water Department shall be <br /> notified 24 hours prior to excavation. If the 48" line is esposed in anyway during <br /> excavation the Water Department shall be notified and an inspection of the main <br /> shall be made prior to backfill. Any damage to the 48" pipe or to its coating shall <br /> be the responsibility of the own'er or his contractor. <br /> . The construction of the restaurant will not have a signficant impact on the water <br /> system. The �Vatcr Department sho;Ad have no objections to the proposal. <br /> SEWER: <br /> The proposed plan for sanitary sewer service to the new building :s acceptable to <br /> me. All side sewers from the area of the ne�v parking lot must be c� ped at the <br /> property line. <br /> DRAINAGE: ' <br /> '!'he drainage should be connected to the 48" sewer overflow line instead of the . <br /> Snterceptor. I would like to see it connected by constructing a manhole over the <br /> 48 inch line. This would then permit the radio station building to connect their <br /> • drainage to the catch basin in the alley. Perhaps the radio station builders couid <br /> � contribute to the,cost of the manhole since it will,save them money for their storm <br /> drainage connection. <br /> The alley adjacent to and east of the parking lot should be "Veed" in the center for <br /> - drainage. <br /> Although it doesn't affect the Sewer Department, it seems to me that draining the <br /> parking lot all ilie �vay to Pacific will result in patrons having to walk through storm <br /> water when going to and from their cars. <br /> The proposed catcli basin in the allcy should be a type II per AP�VA standard speci- <br /> fications and the manhole over the 48" overFlo�v should be a type III-72 pe AP�VA standa: <br /> specifications. � � s'�� <br /> . � � � r <br /> � pl��� ��rr <br /> p��')q�'.�j C-rrr'''n <br /> . i <br />
The URL can be used to link to this page
Your browser does not support the video tag.