Laserfiche WebLink
Providence Everett Medical Centa <br /> Chapter 246-320 WAC Hospitals <br /> Bresst Center(Outpatient) <br /> P1�n Revkw Commenb <br /> � s <br /> �` � � <br /> r' 9 <br /> � � < <br /> o�e u° � z <br /> S 1 � Provide a sink in the film developing area. WAC 246-320-785(1)(bxv) <br /> Approved 3/18/02 as per response lelter dated 3/4/02 indicatlng room is oelY <br /> used tor loading of film cacsettes. <br /> S 2 � What arc the boxes in doon• 148B and 137B? WAC 240-320-505(2) <br /> Approved 3/19/02 as per response letter indicsting boxes are relites in the <br /> doors to the soiled utllity and housekeepfng. <br /> S 3 � OEtain approvals for Radiation Shielding from DOH-Radiation Protection for the <br /> Stereotactic room 132B. Contact Aiton Jenkins at(360) 236-3231. Provide a copy <br /> of the approval letter. <br /> Approved 3/18/02 as per response letter dated 3/4/02 and intormatloe me�no <br /> indicating shielding review for a mammo stereotactic biopsy system is not <br /> required. <br /> S 4 � Locate housekeeping for this area. WAC 246-320-785(1)(a)(iii) <br /> Approved 3/19/02 as per responsc letter locating housekeeping on same tloi►r <br /> across from waiting lobby. <br /> S 5 � Provide manufacturers labeled carpet specifications and radiant panel test report. <br /> WAC 246-320-525(6)(b) <br /> Approved 3/19/02 as per response letter and manufacturers specifications <br /> stating"Lees, Kerry D4736,Broadloom". <br /> S 6 � Place a reduced pressure backFlow assembly on the water supply to film <br /> developers. WAC 246-320-525(4)(a) <br /> Approved 3/19/02 as per response letter locating reduced pressure backflow <br /> assembly on the revised plumbing plan P2.0 and indicated in key notes M2. <br /> Page 3 of 7 Plan Review C�:mn�ents for Project M 6433 <br /> Revicw Key: A=Archiiect F=Fire&Li(c Safe�y S=Sanitarian M=Mahanic^�/Elmnal C=Conferttks Note <br /> t.:1� <br />