Laserfiche WebLink
e . � <br /> � e � <br /> � � � Z <br /> 15.1 � Not Approved 4/23/02 Provide a shobe device.in Consulting 122B. Sec. <br /> 1106.15.2,Unifortn Auilding Code-Washington State Amendmonts . <br /> Accepted S/21/211002.Strobe devia added as shown on revt9ed sheet E2.0. <br /> A 16 [Si Provide revised drawings separating the clinic fium the ratai cortidor with a fire <br /> rated wall and opening assemblies at Waiting lO1B,or ezplain how the sta�efront <br /> system meets building code. WAC 246-320-525(2), Sx.4.3.4,Uniform Building <br /> Code. <br /> 16.1 Not Approved 3/15/02 Shell drawings located a one-hour corridor wall along <br /> south side of Public Lobby. <br /> 16.1.1 Not Approved 5/2J02 Cannot be approved until in a,�z:.ment on the total occupant <br /> load of the three clinics. <br /> Approved S/13/02 The occupant load b noi a[Actor because t6e[acilit�is <br /> Type I rnosdvcdon and the�dre ttoor is a sin�le tenant Exceptbn 6 in Scc. <br /> 1004.3.4.3 allows such ��B�� cecupancies W exiat v�it6 eon-rated corrfdora. <br /> 16.2 Not Approved 3.�15/02 The tenant on the south side Public I.obby shares the <br /> lobby. ff it is the same tenant,then use the total area for calculating tfie occupant <br /> load or show/explain how allowed to separate. <br /> 16.2.1 Not Approved 5/2/02 Provide nevised drawing documenting the calculated <br /> occupant load for exh room or space. Instead of an occupant load of 88 as noted <br /> in your response I calculate an occupant load of 123. <br /> Approved S/13/02 The occupaat Mad is not A hctor because t6e t�cWWty b <br /> Type I construction and the entire tloor is a sin`le teeaaL Excepdon 6 ie Sec. <br /> 1004.3.4.3 albws such "B"occupanck.+to exist with non•rated corridors. <br /> A 17 � Provide revised drawing identifying where the sepazation between the "I" <br /> occupancy and this „B"axupancy will occur. WAC 246-320-525(2),Sec. 302.4�t <br /> Table 3-B,Unifortn Building Code <br /> Approved 3/15/02 Per respon.x all thfs tloa'qualifks as a'B' occnp�ncr with <br /> the sepandon occurring at the tloodceiling. <br /> G�� <br /> Page 6 ot .; Plan Review Commenta for Project N 6�33 <br /> Review Key: A=Archi�xt F=Fire R Life S�fay S=Smiuri�n M�Machrdcal�6lectrical C�Canh�NoM <br />