Laserfiche WebLink
, , <br /> _, � , ... ,� D <br /> �''� : <br /> ;'� � li u 1; �.,i i.e <br /> f� u � <br /> xsvisau SEP 1 i! 1991 <br /> lQTIGATF� DETffi�[IlfATION OF NON-SIGNIFICAlfCB.............................................._...,� <br /> SEPA /37-91 CITY OF EVERETT, <br /> NuMic Works Dept, <br /> �ESCRIPTION OF PROppS]1y; mhe proposed action is the issuance of a <br /> Special Property Use permit, building permits and 9ublic Works <br /> permits to allow the remodel of approximately 36,750 square f^at and <br /> the construction of an approximately 40,97o square foot expansion to <br /> Providence Hospital. The zmerqency entrance would be moved from <br /> Nassau Street to Pacific Avenue. A parkinq structure is proposad on <br /> the Pacific Avenue frontage. <br /> Variances are proposed to all.ow the parking structure within the <br /> front yard setback on Pacific avenue. A 7 foot setback for the <br /> parkinq structure is proposed, rather than the 20 feet required by <br /> the Zoning Code. The proposal also requires a variance from Section <br /> 16.020E of the Zoning Code, which requires that the front builcling <br /> facade of the hospital be located on the front setback line and <br /> that no parkinq is permitted on the portion of the property between <br /> the front lot line and the building. <br /> ���= Providence Hospital <br /> 916 Pacific Avenue <br /> Everett, WA 98201 <br /> :+�ATION: 916 Pacific l,venue - south of Pacific avenue, <br /> West of Nassau Street <br /> Constructi��n of temporary parkinq proposed west <br /> of Norton ��venue, between Paciffc and 32nd <br /> Street <br /> ZONING: R-3C: Multi-Family Medium Density - �linic and <br /> Medical Related Activities Over:.ay Zone <br /> Lead Aqency: City of Evereti Planninq Dept. <br /> Contact Person: Mary Cunningham Phone: 259-87�1 <br /> �iiaation KeasL p�• <br /> The environmental impacts of this prop�sal are documented in the <br /> Environmental Checklist and other information on file with the City. <br /> The listed requirements are placed in response to our review of this <br /> information: <br /> MITIGATION OF ADVSR38 IMPACTS BY SSP11 <br /> 1. Prior to issuance of any permits, a plan for temporary parking <br /> during construction must be reviewed and approved by the Public <br /> 1 <br />