My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
916 PACIFIC AVE 1ST FLOOR 2018-01-01 MF Import
>
Address Records
>
PACIFIC AVE
>
916
>
1ST FLOOR
>
916 PACIFIC AVE 1ST FLOOR 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/24/2019 12:17:36 PM
Creation date
2/25/2017 8:30:27 AM
Metadata
Fields
Template:
Address Document
Street Name
PACIFIC AVE
Street Number
916
Tenant Name
1ST FLOOR
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
764
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br /> Botesch, Nash & Hall Architects, P.S. <br /> February 21, 1992 <br /> Ms. Mary Cunninpham <br /> City af Everett ^�anning Department <br /> 2731 V✓etmor� Avenuu <br /> Everett, WA 98241 <br /> Re: Providence Nospital <br /> Buildinp Permit Review <br /> Job �lo. 855 <br /> Dear Mary: <br /> 1 am writinp in response to your request for additional intormation as outlined in your letter of <br /> February 14, 1992. I will address items "b" through "e" in that letter. <br /> b. Sheets L-1, L-2, C-1, and C-2 have been revised to indicate the sicewalk separation <br /> shown on Sheet A-14. This pedestrian ro���e was designed to be the most direct <br /> path to Pacific Avenue, while avoiding adverse slopes. The path will either be <br /> separated by a six-inch•hiph concrete curb or a siz•inch raised sidewalk. We will <br /> review this solution with Kirk Brooks. <br /> c. Sheets L-1 and L-2 have been revised to indicate the two west site stairways as <br /> shown on Sheet C-1. The irripation system has been revised accordingly. <br /> d. The total valuation for Providence Hospital's plant and equipment is S73,909,?00. If <br /> the fixed equipment value of 429,313,000 is deducted fro�n that amount, the total is <br /> 444,596,200. Construction cost, as estimated on the building permit application, is <br /> S7,138,338. This amount is 16 percent of the plant vaiue, which is in compli�nce <br /> with Section 35.0308 of the zoninp code. It should l�e noted that the plaiit value <br /> mentioned above excludes the south parking paraBe and west medical ofiice builJing. <br /> e. Please see the attached drawings titled "Temporary Construction Parking Diagram" <br /> and "North Garape Cirr.ulation Plan". <br /> The temporary parkinp diagram indicates the layout with var�ous footnotas numbered <br /> 1 through 9. The existinp north parking lot has 107 parking spaces, vuhich will be <br /> lost for a period of aiK to eight months durinp the twentymonth construction pe;iod. <br /> It is in the owner's best interest to minimize this disruption of circulation. For the <br /> tirst (ew months of the project, tlie north lot will remain unaffected, with the <br /> exception of the northwest corner (Foot�ote 9) where the Newland Cunstruction job <br /> shack lias been located. A new sign has been posted in this lot IFootnote 1) <br /> directing users to the south garage for public parking. <br /> The existinp site directory sign located at the intersection of Pacific Avenue and <br /> Nassau Street (Footnote 2) will be revised to indicate "Public Parking" and an arrow <br /> to the south. <br /> 4206 Hoyt Avenue • Everett,Washington 98203 • 206/259-0868 • 206/774-3341 • FAX 2061252-4334 <br />
The URL can be used to link to this page
Your browser does not support the video tag.