Laserfiche WebLink
0 <br /> Botesch, Nash & Hall Architects, P.S. <br /> February 21, 1992 <br /> Ms. Mary Cunninpham <br /> City af Everett ^�anning Department <br /> 2731 V✓etmor� Avenuu <br /> Everett, WA 98241 <br /> Re: Providence Nospital <br /> Buildinp Permit Review <br /> Job �lo. 855 <br /> Dear Mary: <br /> 1 am writinp in response to your request for additional intormation as outlined in your letter of <br /> February 14, 1992. I will address items "b" through "e" in that letter. <br /> b. Sheets L-1, L-2, C-1, and C-2 have been revised to indicate the sicewalk separation <br /> shown on Sheet A-14. This pedestrian ro���e was designed to be the most direct <br /> path to Pacific Avenue, while avoiding adverse slopes. The path will either be <br /> separated by a six-inch•hiph concrete curb or a siz•inch raised sidewalk. We will <br /> review this solution with Kirk Brooks. <br /> c. Sheets L-1 and L-2 have been revised to indicate the two west site stairways as <br /> shown on Sheet C-1. The irripation system has been revised accordingly. <br /> d. The total valuation for Providence Hospital's plant and equipment is S73,909,?00. If <br /> the fixed equipment value of 429,313,000 is deducted fro�n that amount, the total is <br /> 444,596,200. Construction cost, as estimated on the building permit application, is <br /> S7,138,338. This amount is 16 percent of the plant vaiue, which is in compli�nce <br /> with Section 35.0308 of the zoninp code. It should l�e noted that the plaiit value <br /> mentioned above excludes the south parking paraBe and west medical ofiice builJing. <br /> e. Please see the attached drawings titled "Temporary Construction Parking Diagram" <br /> and "North Garape Cirr.ulation Plan". <br /> The temporary parkinp diagram indicates the layout with var�ous footnotas numbered <br /> 1 through 9. The existinp north parking lot has 107 parking spaces, vuhich will be <br /> lost for a period of aiK to eight months durinp the twentymonth construction pe;iod. <br /> It is in the owner's best interest to minimize this disruption of circulation. For the <br /> tirst (ew months of the project, tlie north lot will remain unaffected, with the <br /> exception of the northwest corner (Foot�ote 9) where the Newland Cunstruction job <br /> shack lias been located. A new sign has been posted in this lot IFootnote 1) <br /> directing users to the south garage for public parking. <br /> The existinp site directory sign located at the intersection of Pacific Avenue and <br /> Nassau Street (Footnote 2) will be revised to indicate "Public Parking" and an arrow <br /> to the south. <br /> 4206 Hoyt Avenue • Everett,Washington 98203 • 206/259-0868 • 206/774-3341 • FAX 2061252-4334 <br />